Integrated continuous berth allocation and quay crane assignment and scheduling problem with time-dependent physical constraints in container terminals

被引:36
|
作者
Malekahmadi, Amirsalar [1 ]
Alinaghian, Mehdi [1 ]
Hejazi, Seyed Reza [1 ]
Saidipour, Mohammad Ali Assl [2 ]
机构
[1] Isfahan Univ Technol, Dept Ind & Syst Engn, Esfahan, Iran
[2] Ports & Maritime Org Iran, Tehran, Iran
关键词
Integrated model; Berth allocation; Quay crane assignment; Quay crane scheduling; Time dependence; Tide; ALGORITHM; OPTIMIZATION; ARRIVAL; MODELS;
D O I
10.1016/j.cie.2020.106672
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper presents an integer programming model for integrated continuous berth allocation, quay crane assignment and quay crane scheduling problem (BACASP) in container terminals where berthing possibility depends on water depth and tide conditions. The proposed model also considers the safe distance between quay cranes and the fact that they cannot cross each other on the rails. Given the NP-Hard complexity of the proposed model, a particle swarm optimization (PSO) based meta-heuristic called the random topology particle swarm optimization algorithm (RTPSO) is developed for solving its large-size instances. To evaluate the performance of the developed RTPSO, its results are compared with the results of the exact solution and the basic PSO. The results illustrate the better performance of the proposed random topology particle swarm optimization algorithm in terms of accuracy and computational time.
引用
收藏
页数:12
相关论文
共 50 条
  • [1] A genetic algorithm for the integrated berth allocation and quay crane scheduling problem in container terminals
    Ren, Jie
    Shang, Xiao Ting
    Cao, Jin Xin
    [J]. PROCEEDINGS OF THE 2015 4TH INTERNATIONAL CONFERENCE ON SENSORS, MEASUREMENT AND INTELLIGENT MATERIALS, 2016, 43 : 1036 - 1040
  • [2] Simultaneous Optimization of Berth Allocation, Quay Crane Assignment and Quay Crane Scheduling Problems in Container Terminals
    Aras, Necati
    Turkogullari, Yavuz
    Taskin, Z. Caner
    Altinel, Kuban
    [J]. OPERATIONS RESEARCH PROCEEDINGS 2012, 2014, : 101 - 107
  • [3] Optimal berth allocation, time-variant quay crane assignment and scheduling with crane setups in container terminals
    Turkogullari, Yavuz B.
    Taskin, Z. Caner
    Aras, Necati
    Altinel, I. Kuban
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 254 (03) : 985 - 1001
  • [4] Integrated discrete berth allocation and quay crane scheduling in port container terminals
    Lee, Der-Horng
    Wang, Hui Qiu
    [J]. ENGINEERING OPTIMIZATION, 2010, 42 (08) : 747 - 761
  • [5] Optimal berth allocation and time-invariant quay crane assignment in container terminals
    Turkogullari, Yavuz B.
    Taskin, Z. Caner
    Aras, Necati
    Altinel, I. Kuban
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 235 (01) : 88 - 101
  • [6] A survey of berth allocation and quay crane scheduling problems in container terminals
    Bierwirth, Christian
    Meisel, Frank
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 202 (03) : 615 - 627
  • [7] MIP approaches for the integrated berth allocation and quay crane assignment and scheduling problem
    Agra, Agostinho
    Oliveira, Maryse
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 264 (01) : 138 - 148
  • [8] An Online Model of Berth and Quay Crane Integrated Allocation in Container Terminals
    Zheng, Feifeng
    Qiao, Longliang
    Liu, Ming
    [J]. COMBINATORIAL OPTIMIZATION AND APPLICATIONS, (COCOA 2015), 2015, 9486 : 721 - 730
  • [9] An integrated quay crane assignment and scheduling problem with several contractors in container terminals
    Safaeian, M.
    Etebari, F.
    Vahdani, B.
    [J]. SCIENTIA IRANICA, 2021, 28 (02) : 1030 - 1048
  • [10] Robust Scheduling for Berth Allocation and Quay Crane Assignment Problem
    Rodriguez-Molins, M.
    Salido, M. A.
    Barber, F.
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2014, 2014