Multi-objective metaheuristic algorithms for the resource-constrained project scheduling problem with precedence relations

被引:33
|
作者
Gomes, Helton Cristiano [1 ]
das Neves, Francisco de Assis [1 ]
Freitas Souza, Marcone Jamilson [2 ]
机构
[1] Univ Fed Ouro Preto, Dept Engn Civil, BR-35400000 Ouro Preto, MG, Brazil
[2] Univ Fed Ouro Preto, Dept Ciencia Comp, BR-35400000 Ouro Preto, MG, Brazil
关键词
Project management; Resource constrained project scheduling; Multi-objective optimization; Metaheuristics; GRASP;
D O I
10.1016/j.cor.2013.11.002
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This study addresses the resource-constrained project scheduling problem with precedence relations, and aims at minimizing two criteria: the makespan and the total weighted start time of the activities. To solve the problem, five multi-objective metaheuristic algorithms are analyzed, based on Multi-objective GRASP (MOG), Multi-objective Variable Neighborhood Search (MOVNS) and Pareto Iterated Local Search (PILS) methods. The proposed algorithms use strategies based on the concept of Pareto Dominance to search for solutions and determine the set of non-dominated solutions. The solutions obtained by the algorithms, from a set of instances adapted from the literature, are compared using four multi-objective performance measures: distance metrics, hypervolume indicator, epsilon metric and error ratio. The computational tests have indicated an algorithm based on MOVNS as the most efficient one, compared to the distance metrics; also, a combined feature of MOG and MOVNS appears to be superior compared to the hypervolume and epsilon metrics and one based on PILS compared to the error ratio. Statistical experiments have shown a significant difference between some proposed algorithms compared to the distance metrics, epsilon metric and error ratio. However, significant difference between the proposed algorithms with respect to hypervolume indicator was not observed. (C) 2013 Elsevier Ltd. All rights reserved.
引用
收藏
页码:92 / 104
页数:13
相关论文
共 50 条
  • [31] A Multi-objective Resource-Constrained Project-Scheduling Problem Using Mean Field Annealing Neural Networks
    Jaberi, Mojahed
    Jaberi, Mohammad
    [J]. JOURNAL OF MATHEMATICS AND COMPUTER SCIENCE-JMCS, 2014, 9 (03): : 228 - 239
  • [32] Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms
    Alcaraz, J
    Maroto, C
    Ruiz, R
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2003, 54 (06) : 614 - 626
  • [33] New algorithms for a partial multi-skill resource-constrained project scheduling problem
    Su, Zhixiong
    Gu, Huiming
    Qi, Jianxun
    Wei, Hanying
    [J]. Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2022, 42 (05): : 1345 - 1365
  • [34] Resource-constrained multi-project scheduling problem: A survey
    Gomez Sanchez, Mariam
    Lalla-Ruiz, Eduardo
    Gil, Alejandro Fernandez
    Castro, Carlos
    Voss, Stefan
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 309 (03) : 958 - 976
  • [35] Multi-objective multi-mode resource constrained project scheduling problem using Pareto-based algorithms
    Tirkolaee, Erfan Babaee
    Goli, Alireza
    Hematian, Milad
    Sangaiah, Arun Kumar
    Han, Tao
    [J]. COMPUTING, 2019, 101 (06) : 547 - 570
  • [36] Multi-objective multi-mode resource constrained project scheduling problem using Pareto-based algorithms
    Erfan Babaee Tirkolaee
    Alireza Goli
    Milad Hematian
    Arun Kumar Sangaiah
    Tao Han
    [J]. Computing, 2019, 101 : 547 - 570
  • [37] A tool to test and validate algorithms for the resource-constrained project scheduling problem
    Vanhoucke, Mario
    Coelho, Jose
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 118 : 251 - 265
  • [38] A multi-objective multi-agent optimization algorithm for the multi-skill resource-constrained project scheduling problem with transfer times
    Hosseinian, Amir Hossein
    Baradaran, Vahid
    [J]. RAIRO-OPERATIONS RESEARCH, 2021, 55 (04) : 2093 - 2128
  • [39] A hybrid metaheuristic for resource-constrained project scheduling with, flexible resource profiles
    Tritschler, Martin
    Naber, Anulark
    Kolisch, Rainer
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 262 (01) : 262 - 273
  • [40] Optimization algorithms for solving resource-constrained project scheduling problem: A review
    Liu, Shi-Xin
    Wang, Meng-Guang
    Tang, Jia-Fu
    [J]. Kongzhi yu Juece/Control and Decision, 2001, 16 (SUPPL.): : 647 - 651