共 50 条
- [21] GENACE: An efficient cultural algorithm for solving the flexible job-shop problem [J]. CEC2004: PROCEEDINGS OF THE 2004 CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1 AND 2, 2004, : 1759 - 1766
- [22] An Efficient Heuristic Algorithm for Flexible Job-Shop Scheduling Problem with Due Windows [J]. 2022 IEEE 18TH INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2022, : 142 - 147
- [23] A new heuristic algorithm for solving the job shop scheduling problem [J]. COMPUTATION IN MODERN SCIENCE AND ENGINEERING VOL 2, PTS A AND B, 2007, 2 : 1412 - 1416
- [24] PBIL ALGORITHM FOR FLEXIBLE JOB-SHOP PROBLEM [J]. INTERNATIONAL SYMPOSIUM ON COMPUTER SCIENCE & TECHNOLOGY, PROCEEDINGS, 2009, : 551 - 554
- [25] A fast heuristic algorithm for solving parallel-machine job-shop scheduling problems [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 70 (1-4): : 531 - 546
- [26] A fast heuristic algorithm for solving parallel-machine job-shop scheduling problems [J]. The International Journal of Advanced Manufacturing Technology, 2014, 70 : 531 - 546
- [27] A new neighborhood structure for solving the flexible job-shop scheduling problem [J]. Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2021, 41 (09): : 2367 - 2378
- [29] Solving dual flexible job-shop scheduling problem using a Bat Algorithm [J]. ADVANCES IN PRODUCTION ENGINEERING & MANAGEMENT, 2017, 12 (01): : 5 - 16
- [30] A Heuristic Batch Flow Line Dynamic Scheduling Algorithm for the Job-Shop Problem [J]. INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND MANAGEMENT ENGINEERING (ITME 2014), 2014, : 111 - 116