Revenue Based Maintenance Scheduling of A GENCO in Restructured Power Systems

被引:0
|
作者
Tabari, N. Mohammad [1 ]
Pirmoradian, M. [2 ]
Hassanpour, S. B. [3 ]
机构
[1] Islamic Azad Univ, Grad Sch, S Tehran Branch, 48 Jamalzadeh St, Tehran, Iran
[2] Islamic Azad Univ, Elect Dept, Eslamshahr Div, Eslamshar, Iran
[3] Moshanir Consult Engn Co, Tehran, Iran
关键词
D O I
10.1109/ECTICON.2008.4600569
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In a restructured power system, the problem of maintenance scheduling is different from the traditional centralized power system. This paper is demonstrated how GENCOs (generating companies) in a competitive environment prepare the maintenance schedule of their facilities. Taking into account that in the new structure the main purposes of GENCOs are selling electricity as much as possible and making higher profit, the model is setting up. The model consists of an objective function and related constraints, e.g. maintenance window, generation capacity, load and network flow. We apply the branch-and-bound optimization methodology on a GENCO and finally make a discussion about the simulation results.
引用
收藏
页码:873 / +
页数:2
相关论文
共 50 条
  • [21] Generator maintenance scheduling in power systems using metaheuristic-based hybrid approaches
    Dahal, Keshav P.
    Chakpitak, Nopasit
    [J]. ELECTRIC POWER SYSTEMS RESEARCH, 2007, 77 (07) : 771 - 779
  • [22] Bi-objective optimization of maintenance scheduling for power systems
    B. Hadjaissa
    K. Ameur
    S. M. Ait cheikh
    N. Essounbouli
    [J]. The International Journal of Advanced Manufacturing Technology, 2016, 85 : 1361 - 1372
  • [23] Bi-objective optimization of maintenance scheduling for power systems
    Hadjaissa, B.
    Ameur, K.
    Cheikh, S. M. Ait
    Essounbouli, N.
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2016, 85 (5-8): : 1361 - 1372
  • [24] Modern heuristic techniques for scheduling generator maintenance in power systems
    Dahal, KP
    McDonald, JR
    Burt, GM
    [J]. TRANSACTIONS OF THE INSTITUTE OF MEASUREMENT AND CONTROL, 2000, 22 (02) : 179 - 194
  • [25] Constructing outage maintenance scheduling systems for power quality enhancement
    [J]. Huang, Y.-C. (tyh1332@mail.npust.edu.tw), 1600, Chinese Society for Quality (20):
  • [26] Scheduling maintenance optimization of power systems using ant colonies
    Hadjri, S.
    Zeblah, A.
    Ghoraf, A.
    Massim, Y.
    Meziane, R.
    Hamdaoui, H.
    [J]. JOURNAL OF INFORMATION & OPTIMIZATION SCIENCES, 2007, 28 (04): : 523 - 539
  • [27] The Maintenance Scheduling in Deregulated Power Systems with Operational and Practical Constraints
    Bahrami, Farhad
    Moazzami, Majid
    Shahinzadeh, Hossein
    Gharehpetian, Gevork B.
    [J]. 2017 IEEE 4TH INTERNATIONAL CONFERENCE ON KNOWLEDGE-BASED ENGINEERING AND INNOVATION (KBEI), 2017, : 172 - 178
  • [28] Dynamic Maintenance Scheduling for Power Systems Incorporating Hurricane Effects
    Arab, Ali
    Tekin, Eylem
    Khodaei, Amin
    Khator, Suresh K.
    Han, Zhu
    [J]. 2014 IEEE INTERNATIONAL CONFERENCE ON SMART GRID COMMUNICATIONS (SMARTGRIDCOMM), 2014, : 85 - 90
  • [29] Iterative approach to generator maintenance schedule considering unexpected unit failures in restructured power systems
    Feng, Changyou
    Wang, Xifan
    Wang, Jianxue
    [J]. EUROPEAN TRANSACTIONS ON ELECTRICAL POWER, 2011, 21 (01): : 142 - 154
  • [30] Constraint based maintenance scheduling of electric power units
    Gomes, N
    Vale, Z
    [J]. POWER AND ENERGY SYSTEMS, PROCEEDINGS, 2003, : 55 - 60