Revenue Based Maintenance Scheduling of A GENCO in Restructured Power Systems

被引:0
|
作者
Tabari, N. Mohammad [1 ]
Pirmoradian, M. [2 ]
Hassanpour, S. B. [3 ]
机构
[1] Islamic Azad Univ, Grad Sch, S Tehran Branch, 48 Jamalzadeh St, Tehran, Iran
[2] Islamic Azad Univ, Elect Dept, Eslamshahr Div, Eslamshar, Iran
[3] Moshanir Consult Engn Co, Tehran, Iran
关键词
D O I
10.1109/ECTICON.2008.4600569
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In a restructured power system, the problem of maintenance scheduling is different from the traditional centralized power system. This paper is demonstrated how GENCOs (generating companies) in a competitive environment prepare the maintenance schedule of their facilities. Taking into account that in the new structure the main purposes of GENCOs are selling electricity as much as possible and making higher profit, the model is setting up. The model consists of an objective function and related constraints, e.g. maintenance window, generation capacity, load and network flow. We apply the branch-and-bound optimization methodology on a GENCO and finally make a discussion about the simulation results.
引用
收藏
页码:873 / +
页数:2
相关论文
共 50 条
  • [1] Revenue Based Maintenance Scheduling of A GENCO in Restructured Power Systems
    Tabari, Nima Mohammadi
    Pirmoradian, Mahdi
    Hassanpour, Seiiedeh Bahareh
    [J]. 2008 IEEE REGION 8 INTERNATIONAL CONFERENCE ON COMPUTATIONAL TECHNOLOGIES IN ELECTRICAL AND ELECTRONICS ENGINEERING: SIBIRCON 2008, PROCEEDINGS, 2008, : 155 - +
  • [2] Coordinated preventive maintenance scheduling of GENCO and TRANSCO in restructured power systems
    Geetha, T.
    Swarup, K. Shanti
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2009, 31 (10) : 626 - 638
  • [3] Generation maintenance scheduling in restructured power systems
    Conejo, AJ
    García-Bertrand, R
    Díaz-Salazar, A
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (02) : 984 - 992
  • [4] Important viewpoints of maintenance scheduling in restructured power systems
    Esmaeilzadeh, R.
    Amjadi, A.
    Eskandari, H.
    Farrokhifar, M.
    [J]. EUROCON 2007: THE INTERNATIONAL CONFERENCE ON COMPUTER AS A TOOL, VOLS 1-6, 2007, : 2144 - 2151
  • [5] Reliability-based maintenance scheduling of generating units in restructured power systems
    Fotuhi-Firuzabad, Mahmud
    Aminifar, Farrokh
    Shahzadeh, Abbas
    [J]. TURKISH JOURNAL OF ELECTRICAL ENGINEERING AND COMPUTER SCIENCES, 2014, 22 (05) : 1147 - 1158
  • [6] Coordinated maintenance scheduling of Gencos and Transcos in restructured power systems
    Geetha, T.
    Swarup, K. Shanti
    [J]. 2006 IEEE POWER INDIA CONFERENCE, VOLS 1 AND 2, 2006, : 772 - +
  • [7] Mixed Biogeography-Based Optimization for GENCOs' Maintenance Scheduling in Restructured Power Systems
    Fetanat, Abdolvahhab
    Shafipour, Gholamreza
    [J]. APPLIED ARTIFICIAL INTELLIGENCE, 2018, 32 (01) : 65 - 84
  • [8] GENCO's risk-based maintenance outage scheduling
    Wu, Lei
    Shahidehpour, Mohammad
    Li, Tao
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2008, 23 (01) : 127 - 136
  • [9] Multi-objective optimisation of generation maintenance scheduling in restructured power systems based on global criterion method
    Sadeghian, Omid
    Oshnoei, Arman
    Nikkhah, Saman
    Mohammadi-Ivatloo, Behnam
    [J]. IET SMART GRID, 2019, 2 (02) : 203 - 213
  • [10] Copula Based Self Scheduling Model for Risk Averse GenCo in Restructured Electricity Market
    Panda, Dehasmita
    Singh, S. N.
    Kumar, Vimal
    [J]. 2017 7TH INTERNATIONAL CONFERENCE ON POWER SYSTEMS (ICPS), 2017, : 370 - 375