Real life lessons: Learned fleet management systems implementation

被引:0
|
作者
Ball, GR [1 ]
机构
[1] Harris Corp, Melbourne, FL 32919 USA
关键词
D O I
暂无
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
The internal fleet management evaluation and needs assessment study has been completed. Management has approved the plan. Funding has been identified, secured, and approved. A consultant has been hired. You've investigated the technology and understand the benefits to be realized. You've observed the system demonstrations highlighting the unique product capabilities of the industry leaders. The contractual wording has been added and the system specification is completed. You are now finally ready to release your Request For Proposal (RFP) for your competitive procurement of your brand new advanced technology Computer Aided Dispatch (CAD) and Automatic Vehicle Location (AVL) fleet management system - or are you? Have you covered all the bases? Are their any hidden pitfalls you may encounter? Will everything go as planned? Compounding the urgency in answering these questions is the fact that your operations life line - your current radio infrastructure - is near the end of, if not far beyond, its useful life. A two year procurement cycle will only make this matter worse. These system procurements are largely supported by public grants. What assurances do we have that these funds will always be there tomorrow? A CAD/AVL system is a multi-million dollar, highly integrated, computer controlled, advanced communication and information processing system. The fixed price development of such systems specifically for the transit industry is new territory for the supplier. The purchase of such systems is just as new territory to the transit operators. Therefore, it is not unexpected for both sides to be experiencing growing pains. The demand for the technology is out there and there are more than enough suppliers who are more than willing to accommodate those demands. Due to the complexity of these systems, the procurement process necessary is not the same process used to add new buses to an existing fleet or even to purchase new radio equipment. As technology advances, so must procurement methods. The operators are very anxious to begin using their new systems, and contractors are anxious to build a solid and satisfied customer base. A computer system purchase of this magnitude and complexity is most likely a first for many operators. Therefore, for the amount of money the operators are investing, not only is an on schedule delivery anticipated, but, so is a system that leaves them with no operational surprises. This paper focuses not only on what steps lead to a successful CAD/AVL system implementation and deployment, but also, more importantly, what factors transit operators should be aware of early in the procurement cycle that can lead to trouble down the road. The goal here is to present the transit operators with the necessary information to achieve a win-win situation between themselves and their selected contractor.
引用
收藏
页码:32 / 37
页数:6
相关论文
共 50 条
  • [1] Lessons Learned from Real-Life Implementation of Demand Response Management
    Langbein, Peter
    2009 IEEE/PES POWER SYSTEMS CONFERENCE AND EXPOSITION, VOLS 1-3, 2009, : 506 - 506
  • [2] HRSG FLEET INTEGRITY MANAGEMENT: LESSONS LEARNED FROM THE FIELD
    Fabricius, Andreas
    Malloy, James
    Taylor, Mark
    Jackson, Peter
    Moelling, David
    PROCEEDINGS OF THE ASME 2020 POWER CONFERENCE (POWER2020), 2020,
  • [3] Lessons Learned from the Canadian Agency Implementation of Transportation Asset Management Systems
    Hein, David K.
    AIRFIELD AND HIGHWAY PAVEMENTS 2017: DESIGN, CONSTRUCTION, EVALUATION, AND MANAGEMENT OF PAVEMENTS, 2017, : 191 - 200
  • [4] Tutorial: Lessons learned from building real-life recommender systems
    Amatriain, Xavier
    Agarwal, Deepak
    PROCEEDINGS OF THE 10TH ACM CONFERENCE ON RECOMMENDER SYSTEMS (RECSYS'16), 2016, : 433 - 433
  • [5] Classroom polling systems: Implementation and lessons learned
    Weaver, Gabriela C.
    ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 2006, 231
  • [6] LESSONS LEARNED IN DEVELOPMENTAL TESTING IN FLEET
    EDMONDO, PM
    MCCAMMON, PL
    NAVAL ENGINEERS JOURNAL, 1978, 90 (02) : 112 - 118
  • [7] LESSONS LEARNED IN DEVELOPMENTAL TESTING IN FLEET
    SCHULER, JL
    NAVAL ENGINEERS JOURNAL, 1978, 90 (03) : 66 - 67
  • [8] PV system reliability - lessons learned from a fleet of 333 systems
    Kaushik, A.
    Golnas, A.
    RELIABILITY OF PHOTOVOLTAIC CELLS, MODULES, COMPONENTS, AND SYSTEMS IV, 2011, 8112
  • [9] Falling Forward: Lessons Learned from Real-Life Implementation of Adaptive Learning Solutions
    Hursey, Alysson
    Thompson, Kathryn
    Wierzba, Jill
    Tidwell, Elizabeth
    Livingston, Joyner
    Lewis, Jennifer
    ADAPTIVE INSTRUCTIONAL SYSTEMS, AIS 2020, 2020, 12214 : 117 - 129
  • [10] Strategic and management lessons learned in the implementation of a data dictionary
    Cassin, EM
    Lau, LM
    JOURNAL OF THE AMERICAN MEDICAL INFORMATICS ASSOCIATION, 2000, : 977 - 977