共 50 条
- [42] Minimizing Makespan with Start Time-Dependent Jobs in a Two-Machine Flow Shop INTERNATIONAL JOURNAL OF ENGINEERING, 2016, 29 (06): : 778 - 787
- [43] A note on two-machine no-wait flow shop scheduling with deteriorating jobs and machine availability constraints Optimization Letters, 2011, 5 : 183 - 190
- [48] Heuristics for the no-wait flow shop problem with makespan criterion Jisuanji Xuebao, 2008, 7 (1147-1154):