Analysis on Safety of Removing the Closure Segment in a Prestressed Concrete Cable-stayed Bridge

被引:4
|
作者
Li, Hong-jiang [1 ]
Li, Wan-heng [1 ]
Zhang, Jin-quan [1 ]
机构
[1] Res Inst Highway MOC, Beijing 100088, Peoples R China
关键词
Prestressed concrete cable-stayed bridges; Strengthening; Replacing; Removing; Safety;
D O I
10.1016/j.proeng.2012.01.1053
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
Aiming at failure of closure segment in a prestressed concrete cable-stayed bridge, a strengthening technology, namely replacing the closure segment, was firstly put forward. But removing the old closure segment was a process of release of internal force and had great risk. So the structural safety possibly induced by removing must be analyzed and confirmed. Based on FEM and summary of engineering experience, the construction stages for removing the old closure segment were simulated, and then some analysis relevant to safety, including thermal effect, dynamic characteristics and global stability of the whole bridge structure, were systematically presented. According to these analysis results, corresponding prevention and control measures were provided to ensure construction safety. Studies showed that, variation range of its structural state between before and after removing is not obvious, and its dynamic characteristics changed little after removing. In addition, structural instability could not be induced by removing, but for the sake of improving construction safety reliability, necessary safety prevention and control measures were indispensable. Analysis on safety of removing the old closure segment constituted the important part of the strengthening technology of replacing the closure segment, and became the theoretical basis of removing partial structural members for existing bridges. (C) 2011 Published by Elsevier Ltd. Selection and/or peer-review under responsibility of Kunming University of Science and Technology
引用
下载
收藏
页码:464 / 473
页数:10
相关论文
共 50 条
  • [31] Optimum design of concrete cable-stayed bridges with prestressed decks
    Martins, Alberto M. B.
    Simoes, Luis M. C.
    Negrao, Joao H. J. O.
    INTERNATIONAL JOURNAL FOR COMPUTATIONAL METHODS IN ENGINEERING SCIENCE & MECHANICS, 2016, 17 (5-6): : 339 - 349
  • [32] Stochastic Analysis of Prestressed Concrete Cable-stayed Bridges considering Construction Errors
    Guan, Hua
    Chen, Dewei
    ADVANCES IN CIVIL ENGINEERING, PTS 1-6, 2011, 255-260 : 1023 - 1028
  • [33] Analysis of cable-stayed concrete filled steel tube arch bridge
    Yan, Y.
    Xu, H. Y.
    Shang, G. X.
    Ren, L.
    ISISS '2007: PROCEEDINGS OF THE INNOVATION AND SUSTAINABILITY OF STRUCTURES, VOLS 1 AND 2, 2008, : 119 - 124
  • [34] Structure analysis of concrete cable-stayed bridge based on composite element
    Institute of Bridge and Tunnel Engineering, Southeast University, Nanjing 210096, China
    不详
    Gongcheng Lixue, 2009, 2 (137-141+157):
  • [36] Finite-element Analysis of Prestressed Concrete Stayed-cable Bridge
    Tang, Kedong
    Fu, Jian
    Zhao, Shunbo
    Zhao, Shan
    Pei, Songwei
    ICMS2010: PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON MODELLING AND SIMULATION, VOL 2: MODELLING AND SIMULATION IN ENGINEERING, 2010, : 425 - 428
  • [37] Analysis on bearing safety of anchorage zone between girder and cable in cable-stayed bridge
    Wei, X
    Li, XZ
    Li, J
    Qiang, SZ
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL V, PTS A AND B, 2005, 5 : 1523 - 1528
  • [38] Precast prestressed cable-stayed pedestrian bridge for Bufalo Industrial Park
    Li, ZQ
    Ramirez, R
    PCI JOURNAL, 2000, 45 (03): : 22 - 33
  • [39] ENERGY ANALYSIS OF CABLE-STAYED BRIDGES - CLOSURE
    HEGAB, HIA
    JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 1987, 113 (12): : 2518 - 2520
  • [40] Monitoring calculation of closure change of Extradosed Cable-stayed Bridge
    Shi, Jing Xian
    Ran, Zhi Hong
    2018 4TH INTERNATIONAL CONFERENCE ON ENERGY MATERIALS AND ENVIRONMENT ENGINEERING (ICEMEE 2018), 2018, 38