共 15 条
- [1] Simulation System on the Thermal Stress and Fatigue Life Loss of Startup and Shutdown for a Domestic 600MW Steam Turbo generator Unit [J]. ICEET: 2009 INTERNATIONAL CONFERENCE ON ENERGY AND ENVIRONMENT TECHNOLOGY, VOL 1, PROCEEDINGS, 2009, : 818 - 823
- [2] Finite element analysis on overall stress variation of the boiler drum of 300MW thermal power unit during the startup process [J]. STRUCTURAL INTEGRITY IN NUCLEAR ENGINEERING, 2011, : 307 - 312
- [3] On effective rapid startup of 300 MW steam turbine unit [J]. PROCEEDINGS OF THE 32ND 2020 CHINESE CONTROL AND DECISION CONFERENCE (CCDC 2020), 2020, : 803 - 808
- [4] Reconstruction of the gland sealing system of a 300MW steam turbine unit [J]. ENERGY CONVERSION AND APPLICATION, VOL I AND II, 2001, : 862 - 866
- [6] Assessing the flaws in welded seam of header of a 300MW steam turbine generator unit [J]. ENGINEERING PLASTICITY AND ITS APPLICATIONS FROM NANOSCALE TO MACROSCALE, PTS 1 AND 2, 2007, 340-341 : 1431 - +
- [7] Superheater Steam Temperature Control for a 300MW Boiler Unit with Inverse Dynamic Process Models [J]. IEEE POWER AND ENERGY SOCIETY GENERAL MEETING 2010, 2010,
- [9] The development of FGD DCS simulation system on a 300MW thermal power unit based on the virtual technology [J]. ENERGY EDUCATION SCIENCE AND TECHNOLOGY PART A-ENERGY SCIENCE AND RESEARCH, 2011, 28 (01): : 27 - 36