The Thermal Stress of a Domestic 300MW Steam Turbo Unit During Its Startup and Shutdown

被引:0
|
作者
Wang, Haitao [1 ]
Xia, Yunchun [2 ]
机构
[1] Anhui Univ Architecture, Sch Environm & Energy Engn, 856 South Rd Jinzhai, Hefei 230022, Peoples R China
[2] Anhui Univ ArchitectureNo 856, Sch Civil Engn, Hefei 230022, Peoples R China
来源
关键词
steam turbo unit; thermal stress; fatigue life loss; rotor; startup; shutdown;
D O I
10.4028/www.scientific.net/AMM.275-277.87
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The simulation system on the thermal stress of the rotor during startup & shutdown for a domestic 300MW steam turbo unit, by the simulation, the surface of the shaft was suffered a crushing stress, but it was a pulling stress when a unit shutdown. The max thermal stress & the max combined stress produced on the rotor of a medium pressure cylinder was about 16% bigger than those on the rotor of the high pressure cylinder when they had the same increase rate of temperature. When thought from economics & safety, the optimal temperature-increase-rate of the rotor was 1.6 degrees C/min when the unit startup at cold state, but it was 1.8 degrees C/min when started up and shut down the unit at hot state, it's optimal for slipping-parameter and the optimal temperature-decease-rate of the rotor was 0.85 degrees C/min.
引用
收藏
页码:87 / +
页数:2
相关论文
共 15 条
  • [1] Simulation System on the Thermal Stress and Fatigue Life Loss of Startup and Shutdown for a Domestic 600MW Steam Turbo generator Unit
    Xia, Yunchun
    [J]. ICEET: 2009 INTERNATIONAL CONFERENCE ON ENERGY AND ENVIRONMENT TECHNOLOGY, VOL 1, PROCEEDINGS, 2009, : 818 - 823
  • [2] Finite element analysis on overall stress variation of the boiler drum of 300MW thermal power unit during the startup process
    He, Jianjun
    Chen, Jian
    Li, Guang
    Liu, Wenhui
    Qiu, Wei
    Li, Wei
    [J]. STRUCTURAL INTEGRITY IN NUCLEAR ENGINEERING, 2011, : 307 - 312
  • [3] On effective rapid startup of 300 MW steam turbine unit
    Dong, Chao
    Wang, Bin
    Sun, Yongjian
    Wang, Xiaohong
    [J]. PROCEEDINGS OF THE 32ND 2020 CHINESE CONTROL AND DECISION CONFERENCE (CCDC 2020), 2020, : 803 - 808
  • [4] Reconstruction of the gland sealing system of a 300MW steam turbine unit
    Xie, DM
    Liu, GL
    Wang, JM
    Yang, J
    [J]. ENERGY CONVERSION AND APPLICATION, VOL I AND II, 2001, : 862 - 866
  • [5] STARTING A 300MW UNIT FROM DIFFERENT THERMAL STATES
    KAZARINO.SI
    ABKIN, BV
    SURKOVA, AF
    LISOVOI, VG
    [J]. THERMAL ENGINEERING, 1968, 15 (03) : 1 - &
  • [6] Assessing the flaws in welded seam of header of a 300MW steam turbine generator unit
    Song, Li
    Yang, Shuicheng
    Wei, Fengtao
    [J]. ENGINEERING PLASTICITY AND ITS APPLICATIONS FROM NANOSCALE TO MACROSCALE, PTS 1 AND 2, 2007, 340-341 : 1431 - +
  • [7] Superheater Steam Temperature Control for a 300MW Boiler Unit with Inverse Dynamic Process Models
    Ma, Liangyu
    Lin, Yongjun
    Lee, Kwang Y.
    [J]. IEEE POWER AND ENERGY SOCIETY GENERAL MEETING 2010, 2010,
  • [8] PICKUP IN FEED WATER AND ITS CONSTITUENTS OF COPPER COMPOUNDS IN CIRCUIT OF A 300MW UNIT
    DEEVA, AV
    SAICHUK, LE
    [J]. THERMAL ENGINEERING, 1969, 16 (06) : 84 - &
  • [9] The development of FGD DCS simulation system on a 300MW thermal power unit based on the virtual technology
    Huang Xianming
    Zhong Qin
    [J]. ENERGY EDUCATION SCIENCE AND TECHNOLOGY PART A-ENERGY SCIENCE AND RESEARCH, 2011, 28 (01): : 27 - 36
  • [10] Thermal characteristics of a single-shaft 400 MW steam gas unit and its equipment
    Olkhovsky G.G.
    Radin Y.A.
    Tuz N.E.
    Mikheev L.A.
    [J]. Power Technology and Engineering, 2013, 47 (3) : 203 - 209