Railtrack to compensate for Severn Tunnel delays

被引:0
|
作者
不详
机构
关键词
D O I
暂无
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
引用
收藏
页码:8 / 8
页数:1
相关论文
共 25 条
  • [22] Comparison of prediction techniques to compensate time delays caused by digital control of a three-phase buck-type PWM rectifier system
    Nussbaumer, Thomas
    Heldwein, Marcelo Lobo
    Gong, Guanghai
    Round, Simon D.
    Kolar, Johann W.
    IEEE TRANSACTIONS ON INDUSTRIAL ELECTRONICS, 2008, 55 (02) : 791 - 799
  • [23] Use of Ultrasound in Patients With Carpal Tunnel Syndrome: A Cost-Effective Solution to Reduce Delays in Surgical Care
    Charles, Shaquille
    Oommen, Kevin
    Ong, Joshua
    Fowler, John R.
    JOURNAL OF HAND SURGERY-AMERICAN VOLUME, 2022, 47 (10): : 1018.e1 - 1018.e6
  • [24] Accurate tibial tunnel position in transtibial pullout repair for medial meniscus posterior root tears delays the progression of medial joint space narrowing
    Kawada, Koki
    Okazaki, Yuki
    Tamura, Masanori
    Yokoyama, Yusuke
    Ozaki, Toshifumi
    Furumatsu, Takayuki
    KNEE SURGERY SPORTS TRAUMATOLOGY ARTHROSCOPY, 2024, 32 (08) : 2023 - 2031
  • [25] DEVELOPMENT AND TRIALS OF 400KV INTEGRAL PIPE-COOLED SYSTEM STUDY OF MECHANICAL-BEHAVIOR OF CABLES IN INTEGRAL-PIPE WATER-COOLED SYSTEMS AND DESIGN AND CONSTRUCTION OF 400KV CABLE SYSTEM FOR SEVERN TUNNEL - DISCUSSION
    CHERRY, DM
    BANKS, J
    BARNES, CC
    OLIVER, AJ
    PAPADOPULOS, MS
    BIRD, WE
    GREGORY, B
    PESCHKE, E
    MALBURG, PG
    BARTON, AH
    ARNAUD, UC
    BURTON, J
    CROCKETT, AE
    NICHOLSON, JA
    ARKELL, CA
    BLAKE, WE
    BREALEY, ADR
    HACKE
    HANCE, GEA
    PROCEEDINGS OF THE INSTITUTION OF ELECTRICAL ENGINEERS-LONDON, 1978, 125 (10): : 1015 - 1020