Dynamic scheduling model for the construction industry

被引:8
|
作者
Fahmy, Amer [1 ]
Hassan, Tarek [2 ]
Bassioni, Hesham [3 ]
McCaffer, Ronald [2 ]
机构
[1] CCC TAV JV, Project Controls Dept, Muscat, Oman
[2] Loughborough Univ, Sch Architecture Bldg & Civil Engn, Loughborough, Leics, England
[3] Arab Acad Sci Technol & Maritime Transport, Construct & Bldg Engn Dept, Alexandria, Egypt
关键词
Scheduling; Resource management; Multi-objective optimization; Dynamic scheduling; Particle swarm; Resource-constrained project scheduling problem; PROJECT; JUSTIFICATION; OPTIMIZATION; SHOP;
D O I
10.1108/BEPAM-02-2019-0021
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Purpose Basic project control through traditional methods is not sufficient to manage the majority of real-time events in most construction projects. The purpose of this paper is to propose a Dynamic Scheduling (DS) model that utilizes multi-objective optimization of cost, time, resources and cash flow, throughout project construction. Design/methodology/approach Upon reviewing the topic of DS, a worldwide internet survey with 364 respondents was conducted to define end-user requirements. The model was formulated and solution algorithms discussed. Verification was reported using predefined problem sets and a real-life case. Validation was performed via feedback from industry experts. Findings The need for multi-objective dynamic software optimization of construction schedules and the ability to choose among a set of optimal alternatives were highlighted. Model verification through well-known test cases and a real-life project case study showed that the model successfully achieved the required dynamic functionality whether under the small solved example or under the complex case study. The model was validated for practicality, optimization of various DS schedule quality gates, ease of use and software integration with contemporary project management practices. Practical implications Optimized real-time scheduling can provide better resources management including labor utilization and cost efficiency. Furthermore, DS contributes to optimum materials procurement, thus minimizing waste. Social implications Optimized real-time scheduling can provide better resources management including labor utilization and cost efficiency. Furthermore, DS contributes to optimum materials procurement, thus minimizing waste. Originality/value The paper illustrates the importance of DS in construction, identifies the user needs and overviews the development, verification and validation of a model that supports the generation of high-quality schedules beneficial to large-scale projects.
引用
收藏
页码:313 / 330
页数:18
相关论文
共 50 条
  • [1] A DYNAMIC MODEL FOR PROJECT REVIEW IN THE CONSTRUCTION INDUSTRY
    Eleyan, Derar
    Loucopoulos, Peri
    [J]. JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2011, 16 : 577 - 600
  • [2] Development of a Dynamic Model of Quality Performance in Thai Construction Industry
    Chinda, Thanwadee
    Sittimak, K.
    Thalaengkij, N.
    Chaiyapong, P.
    Sornpasit, P.
    Ketnak, W.
    [J]. 9TH INTERNATIONAL CONFERENCE ON ENGINEERING, PROJECT, AND PRODUCTION MANAGEMENT (EPPM2018), 2020, 312
  • [3] DYNAMIC PRODUCTION SCHEDULING FOR A PROCESS INDUSTRY
    DEMATTA, R
    GUIGNARD, M
    [J]. OPERATIONS RESEARCH, 1994, 42 (03) : 492 - 503
  • [4] SCHEDULING GAME FOR CONSTRUCTION-INDUSTRY TRAINING
    LOVERING, HD
    [J]. JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1974, 100 (NCO1): : 102 - 103
  • [5] Fairness model considering satisfaction and preferences for service scheduling on electronic platforms in construction industry
    Yang, Jing
    Zhong, Botao
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2024, 244
  • [6] Fairness model considering satisfaction and preferences for service scheduling on electronic platforms in construction industry
    Yang, Jing
    Zhong, Botao
    [J]. Expert Systems with Applications, 2024, 244
  • [7] Survey of the construction industry relative to the use of CPM scheduling for construction projects
    Galloway, Patricia D.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (07) : 697 - 711
  • [8] Scheduling decisions and their dynamic consequences on construction performance
    Moonseo Park
    Wooyoung Kim
    Yousang Yoon
    Madhav Prasad Nepal
    [J]. KSCE Journal of Civil Engineering, 2010, 14 : 251 - 259
  • [9] Scheduling decisions and their dynamic consequences on construction performance
    Park, Moonseo
    Kim, Wooyoung
    Yoon, Yousang
    Nepal, Madhav Prasad
    [J]. KSCE JOURNAL OF CIVIL ENGINEERING, 2010, 14 (03) : 251 - 259
  • [10] SCHEDULING GAME FOR CONSTRUCTION-INDUSTRY TRAINING - REPLY
    SCOTT, D
    CULLINGF.G
    [J]. JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1974, 100 (NCO3): : 491 - 491