DYNAMIC PRODUCTION SCHEDULING FOR A PROCESS INDUSTRY

被引:20
|
作者
DEMATTA, R [1 ]
GUIGNARD, M [1 ]
机构
[1] UNIV PENN,WHARTON SCH,PHILADELPHIA,PA 19104
关键词
D O I
10.1287/opre.42.3.492
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Capacity-oriented production scheduling can be described as the assignment of competing products to several single level, capacitated production lines over a given planning horizon. This study was initially motivated by the production planning of various types of tiles by a tile manufacturing company. We considered different integer programming formulations and found that a disaggregated model, while increasing the size of the model, lends itself best to Lagrangian techniques and produces the strongest bounds. Additionally, from every Lagrangian solution, we can generate a feasible production schedule by systematically reassigning lines from products whose production exceeded demand to products with unsatisfied demands. The technique is not specific to tile companies, but can be used by any firm where product setups on production lines can be scheduled between consecutive periods with changeover cost, but without production loss. Our computational experience with real data from the tile company and randomly generated problem instances gave excellent lower and upper bounds.
引用
收藏
页码:492 / 503
页数:12
相关论文
共 50 条
  • [1] Production and inter-facility transportation scheduling for a process industry
    de Matta, RT
    Miller, T
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 158 (01) : 72 - 88
  • [2] Integrated production planning and scheduling optimization of multisite, multiproduct process industry
    Shah, Nikisha K.
    Ierapetritou, Marianthi G.
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 2012, 37 : 214 - 226
  • [3] MASTER PRODUCTION SCHEDULING FOR A PROCESS INDUSTRY ENVIRONMENT - A CASE-STUDY
    VENKATARAMAN, R
    NATHAN, J
    [J]. INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 1994, 14 (10) : 44 - 53
  • [4] Planning and scheduling in the process industry
    Kallrath J.
    [J]. OR Spectrum, 2002, 24 (3) : 219 - 250
  • [5] Planning and scheduling in the process industry
    Kallrath, J
    [J]. OR SPECTRUM, 2002, 24 (03) : 219 - 250
  • [6] Production Scheduling in Industry 4.0
    Li, Yuanyuan
    Goga, Klodiana
    Tadei, Roberto
    Terzo, Olivier
    [J]. COMPLEX, INTELLIGENT AND SOFTWARE INTENSIVE SYSTEMS, 2021, 1194 : 355 - 364
  • [7] Production scheduling problems of steelmaking-continuous casting process in dynamic production environment
    Zheng, Zhong
    Long, Jian-yu
    Gao, Xiao-qiang
    [J]. JOURNAL OF IRON AND STEEL RESEARCH INTERNATIONAL, 2017, 24 (06) : 586 - 594
  • [8] Production scheduling problems of steelmaking-continuous casting process in dynamic production environment
    Zhong Zheng
    Jian-yu Long
    Xiao-qiang Gao
    [J]. Journal of Iron and Steel Research International, 2017, 24 : 586 - 594
  • [9] Production scheduling problems of steelmaking-continuous casting process in dynamic production environment
    Zhong Zheng
    Jian-yu Long
    Xiao-qiang Gao
    [J]. Journal of Iron and Steel Research(International), 2017, 24 (06) : 586 - 594
  • [10] Dynamic Reentrant Scheduling Simulation for Assembly and Test Production Line in Semiconductor Industry
    Liu, Aijun
    Yang, Yu
    Liang, Xuedong
    Zhu, Minghua
    Yao, Hao
    [J]. MANUFACTURING SCIENCE AND ENGINEERING, PTS 1-5, 2010, 97-101 : 2418 - 2422