Kannagawa Hydropower Plant, Japan

被引:0
|
作者
Peltier, Robert
机构
关键词
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
With the commercial debut of the first of six planned 470-MW turbines in December 2005, the time has come to pay homage the sheer size (2,820 MW) and longevity (13 years and counting) of TEPCO's Kannagawa Hydropower Plant. By the time Unit 2 is commissioned in 2010, and Units 3 through 6 go on-line "in and after 2016," two generations of engineers, technicians, and builders will have worked on the "pure" pumped-storage project since its inception. As if those stats weren't impressive enough, Kannagawa marks the debut of "splitter runners" for pump-turbines. They increase the effective head of the plant to the highest in the world: 2,142 feet, at a flow of 135,000 gallons/second. That's a very large pump-turbine, indeed.
引用
收藏
页码:54 / +
页数:4
相关论文
共 50 条
  • [21] Operation and Maintenance of the Merowe Hydropower Plant
    Brown, Martin
    Scheid, Yannick
    Moedinger, Jens
    [J]. WASSERWIRTSCHAFT, 2011, 101 (1-2) : 49 - 53
  • [22] A review on hydropower plant models and control
    Kishor, Nand
    Saini, R. P.
    Singh, S. P.
    [J]. RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2007, 11 (05): : 776 - 796
  • [23] Laboratory Model of a Small Hydropower Plant
    Sladecek, Vaclav
    Stepanec, Libor
    Chamrad, Petr
    Pavelek, Tomas
    [J]. PROCEEDINGS OF THE 2019 20TH INTERNATIONAL SCIENTIFIC CONFERENCE ON ELECTRIC POWER ENGINEERING (EPE), 2019, : 363 - 366
  • [24] Outlier Detection for Hydropower Generation Plant
    Ahmed, Imtiaz
    Dagnino, Aldo
    Bongiovi, Alessandro
    Ding, Yu
    [J]. 2018 IEEE 14TH INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2018, : 193 - 198
  • [25] Commissioning and Operation of the Hydropower Plant Rheinfelden
    Ficht, Stefan
    [J]. WASSERWIRTSCHAFT, 2013, 103 (06) : 35 - 37
  • [26] Construction of concrete for Wan'an hydropower plant
    Hu, Bailiang
    [J]. Ren Min Chang Jiang/Yangtze River, 1995, 26 (01):
  • [27] The Application of Safety Membranes in Hydropower Plant
    Chen, Sheng
    Zhang, Jian
    Yu, Xiao-dong
    [J]. MACHINE DESIGN AND MANUFACTURING ENGINEERING III, 2014, : 449 - 453
  • [28] SEDIMENTATION IN THE RESERVOIR OF THE ALTENWOERTH HYDROPOWER PLANT
    NACHTNEBEL, HP
    SUMMER, W
    MUELLER, H
    SCHWAIGHOFER, B
    [J]. WATER SCIENCE AND TECHNOLOGY, 1990, 22 (05) : 173 - 180
  • [29] Voith Managing the Hydropower Plant with the Smartphone
    不详
    [J]. WASSERWIRTSCHAFT, 2022, 112 (12) : 57 - 57
  • [30] Initial Situation at the Hydropower Plant Rheinfelden
    Fust, Armin
    Reif, Helmut
    [J]. WASSERWIRTSCHAFT, 2013, 103 (06) : 10 - 14