Failure analysis of boiler water wall-tubes at a power generation plant

被引:0
|
作者
El-Batahgy, A [1 ]
Metwally, W [1 ]
机构
[1] Cent Met R&D Inst, Cairo, Egypt
关键词
D O I
暂无
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
The subject boiler is a suspension type provided on its sides with IK boxes as accesses for retractable soot blowers to clean up the inside of the boiler using steam. The working temperature and pressure of the boiler water wall-tubes are 693 degrees F (367 degrees C) and 2935 psi (20.5 MPa). After approximately 91317 hr. of operation, failure of several boiler wall tubes has taken place at IK boxes. Investigation disclosed that the present failure is attributed to thermal fatigue. Thermal fatigue damage was accelerated as a result of repeatedly rapid cooling by exposure of the external surface of the tubes to water droplets during soot blower function. In this regard, elimination of excessive strain caused by thermal cycles due to the rapid cooling cycles is necessary to eliminate this problem.
引用
收藏
页码:67 / 72
页数:6
相关论文
共 50 条
  • [1] Failure investigation of water wall tubes in a drum boiler of a thermal power plant
    Assefinejad, A. H.
    Kermanpur, A.
    Eslami, A. M.
    Kangazian, J.
    [J]. ENGINEERING FAILURE ANALYSIS, 2020, 118
  • [2] Failure analysis of the wall tubes of a water-tube boiler
    Duarte, Camilo A.
    Espejo, Edgar
    Carlos Martinez, Juan
    [J]. ENGINEERING FAILURE ANALYSIS, 2017, 79 : 704 - 713
  • [3] Failure Investigation of Boiler Water Wall Tubes of a Thermal Power Station
    Munda, Parikshit
    Kumar, Subodh
    Prakash, Amit
    Husain, Md Murtuja
    Rajnikanth, V.
    Chowdhury, S. Ghosh
    [J]. JOURNAL OF FAILURE ANALYSIS AND PREVENTION, 2016, 16 (01) : 9 - 18
  • [4] Failure Analysis of Boiler Tubes Used in a Thermal Power Plant
    S. K. Dhua
    Atul Saxena
    B. K. Jha
    [J]. Transactions of the Indian Institute of Metals, 2016, 69 : 653 - 657
  • [5] Failure Analysis of Boiler Tubes Used in a Thermal Power Plant
    Dhua, S. K.
    Saxena, Atul
    Jha, B. K.
    [J]. TRANSACTIONS OF THE INDIAN INSTITUTE OF METALS, 2016, 69 (02) : 653 - 657
  • [6] Failure Analysis of Superheater Tubes Cracking of a Boiler in a Power Plant
    Sun, Zhiwei
    Fan, Yuling
    Xu, Shugen
    Song, Mingda
    Zhang, Yuan
    [J]. MATERIALS PERFORMANCE AND CHARACTERIZATION, 2018, 7 (01) : 92 - 100
  • [7] Failure analysis of perforation in salty water-wall tubes of a power plant
    Dorri, Mohammad
    Harandizadeh, Davoud
    [J]. ENGINEERING FAILURE ANALYSIS, 2012, 19 : 87 - 96
  • [8] Failure Analysis of a Water Wall Boiler Tube for Power Generation in a District Heating System
    Hong, Minki
    Chae, Hobyung
    Kim, Woo Cheol
    Kim, Jung-Gu
    Kim, Heesan
    Lee, Soo Yeol
    [J]. METALS AND MATERIALS INTERNATIONAL, 2019, 25 (05) : 1191 - 1201
  • [9] Failure Analysis of a Water Wall Boiler Tube for Power Generation in a District Heating System
    Minki Hong
    Hobyung Chae
    Woo Cheol Kim
    Jung-Gu Kim
    Heesan Kim
    Soo Yeol Lee
    [J]. Metals and Materials International, 2019, 25 : 1191 - 1201
  • [10] Analysis of the causes of leakages and preventive strategies of boiler water-wall tubes in a thermal power plant
    Xue, Song
    Guo, Ruidong
    Hu, Fengtao
    Ding, Kai
    Liu, Lv
    Zheng, Lixuan
    Yang, Tao
    [J]. ENGINEERING FAILURE ANALYSIS, 2020, 110