The status of the control system of the KEK accelerator test facility

被引:0
|
作者
Terunuma, N [1 ]
Hayano, H [1 ]
Korhonen, T [1 ]
Kubo, K [1 ]
Naito, T [1 ]
Oide, K [1 ]
Urakawa, J [1 ]
Kashiwagi, S [1 ]
Okugi, T [1 ]
机构
[1] KEK, High Energy Accelerator Res Org, Tsukuba, Ibaraki 305, Japan
关键词
D O I
暂无
中图分类号
O4 [物理学];
学科分类号
0702 ;
摘要
Beam Commissioning for the damping ring of the KEK accelerator test facility (ATF) has been started since January 1997. Control system of the ATF accelerator is based on the CAMAC-enhanced byte-serial highways handled by the Open-VMS Cluster system. Control software is integrated by using a commercial database application for process control. In this paper we present the status of the ATF control system developed during the commissioning phase.
引用
收藏
页码:28 / 30
页数:3
相关论文
共 50 条
  • [21] Modified feed-forward control system at the Accelerator Test Facility
    Liu, Y
    Cline, D
    BenZvi, I
    Wang, XJ
    Sheehan, J
    Batchelor, K
    Malone, R
    Issapour, M
    REVIEW OF SCIENTIFIC INSTRUMENTS, 1997, 68 (02): : 1137 - 1141
  • [22] Mitigating the effects of higher order multipole fields in the magnets of the Accelerator Test Facility 2 at KEK
    Bai Sha
    Bambade, P.
    Wang Dou
    Gao Jie
    Woodley, M.
    Masuzawa, M.
    CHINESE PHYSICS C, 2012, 36 (08) : 756 - 760
  • [23] Mitigating the effects of higher order multipole fields in the magnets of the Accelerator Test Facility 2 at KEK
    白莎
    P. Bambade
    王逗
    高杰
    M. Woodley
    M. Masuzawa
    中国物理C, 2012, (08) : 756 - 760
  • [24] Multibunch beam extraction using the strip-line kicker at the KEK Accelerator Test Facility
    Naito, T.
    Araki, S.
    Hayano, H.
    Kubo, K.
    Kuroda, S.
    Terunuma, N.
    Okugi, T.
    Urakawa, J.
    PHYSICAL REVIEW SPECIAL TOPICS-ACCELERATORS AND BEAMS, 2011, 14 (05):
  • [25] First beam waist measurements in the final focus beam line at the KEK Accelerator Test Facility
    Bai, Sha
    Aryshev, Alexander
    Bambade, Philip
    Mc Cormick, Doug
    Bolzon, Benoit
    Gao, Jie
    Tauchi, Toshiaki
    Zhou, Feng
    PHYSICAL REVIEW SPECIAL TOPICS-ACCELERATORS AND BEAMS, 2010, 13 (09):
  • [26] Evaluation of beam halo from beam-gas scattering at the KEK Accelerator Test Facility
    Yang, R.
    Naito, T.
    Bai, S.
    Aryshev, A.
    Kubo, K.
    Okugi, T.
    Terunuma, N.
    Zhou, D.
    Faus-Golfe, A.
    Kubytskyi, V
    Liu, S.
    Wallon, S.
    Bambade, P.
    PHYSICAL REVIEW ACCELERATORS AND BEAMS, 2018, 21 (05):
  • [27] THE BROOKHAVEN ACCELERATOR TEST FACILITY INJECTION SYSTEM
    WANG, XJ
    KIRK, HG
    PELLEGRINI, C
    MCDONALD, KT
    RUSSELL, DP
    PROCEEDINGS OF THE 1989 IEEE PARTICLE ACCELERATOR CONFERENCE, VOLS 1-3: ACCELERATOR SCIENCE AND TECHNOLOGY, 1989, : 307 - 309
  • [28] A pressurized HeII cryogenic system for the superconducting magnet test facility at KEK
    Kimura, N
    Ohhata, H
    Iida, M
    Tanaka, K
    Tsuchiya, K
    Ajima, Y
    Higashi, N
    Nakamoto, T
    Nakamoto, K
    Ohuchi, N
    Ogitsu, T
    Shintomi, T
    Sugawara, S
    Takahashi, N
    Terashima, A
    Wachi, Y
    Yamamoto, A
    ADVANCES IN CRYOGENIC ENGINEERING, VOL 47, PTS A AND B, 2002, 613 : 123 - 130
  • [29] Linear and second order optics corrections for the KEK Accelerator Test Facility final focus beam line
    Okugi, T.
    Araki, S.
    Bambade, P.
    Kubo, K.
    Kurado, S.
    Masuzawa, M.
    Marin, E.
    Naito, T.
    Tauchi, T.
    Terunuma, N.
    Tomas, R.
    Urakawa, J.
    White, G.
    Woodley, M.
    PHYSICAL REVIEW SPECIAL TOPICS-ACCELERATORS AND BEAMS, 2014, 17 (02):
  • [30] Longitudinal beam instability due to the ring impedance at KEK's accelerator test facility damping ring
    Kim, ES
    JOURNAL OF THE KOREAN PHYSICAL SOCIETY, 2003, 43 (05) : 696 - 703