共 50 条
- [31] A Parallel-machine Scheduling Problem with a Material Handling Device in PCB Production Environment 6TH INTERNATIONAL CONFERENCE ON MANUFACTURING, OPTIMIZATION, INDUSTRIAL AND MATERIAL ENGINEERING : MOIME18, 2018, 2044
- [32] Robotic Measurement System for High-speed PCB Electrical Characterization 2021 16TH INTERNATIONAL MICROSYSTEMS, PACKAGING, ASSEMBLY AND CIRCUITS TECHNOLOGY CONFERENCE (IMPACT), 2021, : 35 - 37
- [35] Effect of material property representation on stresses in endoprostheses Bio-Medical Materials and Engineering, 1998, 8 (01): : 11 - 23
- [37] ROBOTIC OPERATING SYSTEM FOR MATERIAL HANDLING ROBOT. Robotics Amsterdam, 1988, 4 (02): : 157 - 168
- [39] Optimal design of the aluminum electrical railcar under uncertainty of material property MULTI-FUNCTIONAL MATERIALS AND STRUCTURES III, PTS 1 AND 2, 2010, 123-125 : 575 - +
- [40] OaSis: An application specific operating system for an embedded environment 17TH INTERNATIONAL CONFERENCE ON VLSI DESIGN, PROCEEDINGS: DESIGN METHODOLOGIES FOR THE GIGASCALE ERA, 2004, : 776 - 779