Development of CFD fire models for deterministic analyses of the cable issues in the nuclear power plant

被引:6
|
作者
Lin, Chih-Hung [1 ]
Ferng, Yuh-Ming [1 ]
Pei, Bau-Shie [1 ]
机构
[1] Natl Tsing Hua Univ, Dept Engn & Syst Sci, Inst Nucl Engn & Sci, Hsingchu 30013, Taiwan
关键词
LARGE-EDDY-SIMULATION; FLOW;
D O I
10.1016/j.nucengdes.2008.09.010
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
Additional fire barriers of electrical cables are required for the nuclear power plants (NPPs) in Taiwan due to the separation requirements of Appendix R to 10 CFR Part 50. The risk-informed fire analysis (RIFA) may provide a viable method to resolve these fire barrier issues. However, it is necessary to perform the fire scenario analyses so that RIFA can quantitatively determine the risk related to the fire barrier wrap. The CFD fire models are then proposed in this paper to help the RIFA in resolving these issues. Three typical fire scenarios are selected to assess the present CFD models. Compared with the experimental data and other model's simulations, the present calculated results show reasonable agreements, rendering that present CFD fire models can provide the quantitative information for RIFA analyses to release the cable wrap requirements for NPPs. (C) 2008 Elsevier B.V. All rights reserved.
引用
收藏
页码:338 / 345
页数:8
相关论文
共 50 条
  • [41] Accident Analyses of Optimal Designed Nuclear Power Plant
    Chen, Lei
    Li, GuangPu
    Jia, Zhen
    Wang, Cong
    [J]. 2019 IEEE ASIA POWER AND ENERGY ENGINEERING CONFERENCE (APEEC 2019), 2019, : 274 - 277
  • [42] Experience of APROS in nuclear power plant safety analyses
    Kantee, H
    Kallio, H
    Savolainen, S
    [J]. PROCEEDINGS OF THE 2ND CSNI SPECIALIST MEETING ON SIMULATORS AND PLANT ANALYSERS, 1999, 194 : 539 - 552
  • [43] Regulatory issues for nuclear power plant life management
    Roe, J
    [J]. ATW-INTERNATIONALE ZEITSCHRIFT FUR KERNENERGIE, 2001, 46 (04): : 245 - +
  • [44] Regulatory issues for nuclear power plant life management
    Roe, J
    [J]. NUCLEAR POWER PLANT LIFE MANAGEMENT IN A CHANGING BUSINESS WORLD, 2000, : 121 - 130
  • [45] THE FIRE EVENT ANALYSIS FOR FIRE FREQUENCY ESTIMATION ON JAPANESE NUCLEAR POWER PLANT
    Nagata, Yasunori
    Uchida, Tsuyoshi
    Shirai, Koji
    [J]. PROCEEDINGS OF THE 2020 INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING (ICONE2020), VOL 2, 2020,
  • [46] Nuclear power plant development in Korea
    Lee, CK
    [J]. NUCLEAR PLANT JOURNAL, 1999, 17 (03) : 32 - +
  • [47] IMPROVEMENT OF CFD MODELS OF TUNNEL FIRE DEVELOPMENT BASED ON EXPERIMENTAL DATA
    Vidakovic, Barbara M.
    Banjac, Milos J.
    [J]. THERMAL SCIENCE, 2017, 21 : S705 - S716
  • [48] Review of fire hazard analysis of ignalina nuclear power plant
    Alejev, A
    Griskeviciusk, M
    Sukys, R
    Frith, I
    Norta, A
    [J]. 8TH INTERNATIONAL CONFERENCE ON MODERN BUILDING MATERIALS, STRUCTURES AND TECHNIQUES, 2004, : 956 - 962
  • [49] FIRE ALARM SYSTEMS AND ORGANIZATION IN A NUCLEAR-POWER PLANT
    SCIANCALEPORE, A
    [J]. BROWN BOVERI REVIEW, 1979, 66 (08): : 554 - 559
  • [50] FIRE-PREVENTION IN THE PAKS NUCLEAR-POWER PLANT
    HERA, A
    [J]. FIRE PROTECTION AND FIRE FIGHTING IN NUCLEAR INSTALLATIONS, 1989, : 111 - 117