Exploring the environmental impact assessment commissioners' perspectives on the development of the seawater desalination project

被引:19
|
作者
Liu, Ta-Kang [1 ]
Weng, Tzu-Hsun [1 ]
Sheu, Haw-Yang [1 ]
机构
[1] Natl Cheng Kung Univ, Inst Ocean Technol & Marine Affairs, 1 Univ Rd, Tainan 70101, Taiwan
关键词
Desalination; Environmental impact assessment (EIA); Analytic Hierarchy Process (AHP); Brine discharge; Fishery resources; Stakeholder; RECYCLED WATER; PLANTS; ACCEPTANCE; MANAGEMENT; AUSTRALIA; FUTURE;
D O I
10.1016/j.desal.2017.11.031
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
In recent years, extreme climate conditions have resulted in uneven precipitations in Taiwan. The development of traditional water resources frequently suffers from protests of environmental groups, potential dam sites being hard-to-find, and other factors. The development of new water sources has been increasingly difficult. Sea water desalination has the advantages of a short construction time and easy expansion flexibility, making it an important alternative as a new water resource. In this study, the current proposal of Tainan's desalination plant was used as an example. Qualitative interviews and Analytic Hierarchy Process (AHP) were used to explore the environmental impact assessment (EIA) commissioner's perceptions of the impact from the development of the desalination project. The results of the qualitative interview indicate that the main concerns of the EIA commissioners are whether the development could damage the marine ecological environment and its fishery resources, which may have adverse socioeconomic consequences. The AHP results show that the commissioners' priority of environmental impact is ecological environmental impact 36.9%, social impact 29.7%, economic impact 23.7%, and physical and chemical environmental impact 9.7%. The main concerns in each impact category are, respectively, marine ecological environment, land and ocean utilisation, fisheries, and air quality.
引用
收藏
页码:108 / 115
页数:8
相关论文
共 50 条
  • [21] Environmental impact of desalination: A systematic review of Life Cycle Assessment
    Lee, Kyungsun
    Jepson, Wendy
    DESALINATION, 2021, 509
  • [22] Project construction and environmental impact assessment approach
    Berakovic, B
    Pletikapic, Z
    Mahmutovic, Z
    Karleusa, BK
    HYDROPOWER IN THE NEW MILLENNIUM, 2001, : 173 - 179
  • [23] Research on the Environmental Impact Assessment of the Large Project
    Yan, Jianjun
    You, Daming
    ADVANCES IN ASIA-PACIFIC LOW CARBON ECONOMY, 2010, : 143 - 146
  • [24] Environmental impact assessment for Subarnarekha irrigation project
    Rajappa, R.
    Pal, Krishna
    Sharma, Aman
    Sharma, A.K.
    International Journal of Water Resources Development, 1994, 10 (02)
  • [25] Project environmental impact assessment system in Japan
    Li, Tianxin
    Han, Jian-Hong
    Li, Jiaojiao
    Proceedings of 2006 Beijing International Environmental Technology Conference, 2006, : 222 - 228
  • [26] Integrating concentrated solar power with seawater desalination technologies: a multi-regional environmental assessment
    Alhaj, Mohamed
    Al-Ghamdi, Sami G.
    ENVIRONMENTAL RESEARCH LETTERS, 2019, 14 (07)
  • [27] Environmental life cycle assessment of seawater reverse osmosis desalination plant, powered by renewable energy
    Shahabi, Maedeh P.
    McHugh, Adam
    Anda, Martin
    Ho, Goen
    RENEWABLE ENERGY, 2014, 67 : 53 - 58
  • [30] De-politicising seawater desalination: Environmental Impact Assessments in the Atacama mining Region, Chile
    Campero, Cecilia
    Harris, Leila M.
    Kunz, Nadja C.
    ENVIRONMENTAL SCIENCE & POLICY, 2021, 120 : 187 - 194