Study on the passive refrigeration for main control room of nuclear power plant in power outage accident

被引:5
|
作者
Li, Hao [1 ]
Li, Kuining [1 ]
Liu, Bin [1 ]
Li, Jin [2 ]
Meng, Qianqian [1 ]
Yang, Cheng [1 ]
机构
[1] Chongqing Univ, Coll Power Engn, Minist Educ PRC, Key Lab Low Grade Energy Utilizat Technol & Syst, 174 Shazheng St, Chongqing 400044, Peoples R China
[2] Wuhan Branch Shanghai GM, Dept Purchasing, 8 GM St, Wuhan 430200, Hubei, Peoples R China
关键词
High pressure air; Passive cooling strategy; Throttling refrigeration; Expansion refrigeration; Main control room of nuclear power plant; DESIGN; SAFETY; SYSTEM; HEAT; STORAGE; ENERGY; CYCLE;
D O I
10.1016/j.nucengdes.2017.11.022
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
High-pressure air with room temperature can be used for refrigeration through isentropic expansion or isenthalpic throttling process with no power supplying, which can also meet the demands of oxygen supplying for operators in the insulated situation. Two passive cooling strategies for high-pressure air are proposed: one is throttling refrigeration, and the other is expansion refrigeration, which can provide an effective method to ensure the safety of operators in main control room when an emergency occurs in nuclear power plant. Comparisons between the two passive cooling strategies are done by theoretical and experimental methods, and the cooling effects for both strategies are analyzed. The results show that the passive cooling strategy of isentropic expansion can meet the both requirements of cooling and clean air supplying for the main control room when emergencies occur in nuclear plants, with the minimum cooling capacity of 3000 W.
引用
收藏
页码:183 / 189
页数:7
相关论文
共 50 条
  • [21] Application of Virtual Human Factor Verification to Fire Accidents at the Main Control Room in Nuclear Power Plant
    Liu, Zhiyao
    Zhao, Qichao
    Sun, Linwu
    Luo, Yantong
    MAN-MACHINE-ENVIRONMENT SYSTEM ENGINEERING (MMESE 2019), 2020, 576 : 885 - 892
  • [22] Evaluation Model of Performance Shaping Factor of Operator in Digital Main Control Room of Nuclear Power Plant
    Liu Y.
    Zhang L.
    Liu X.
    Liu J.
    Li L.
    Yuanzineng Kexue Jishu/Atomic Energy Science and Technology, 2021, 55 (05): : 926 - 932
  • [23] Development of task analysis method for operator tasks in main control room of an advanced nuclear power plant
    Lin, Chiuhsiang Joe
    Hsieh, Tsung-Ling
    JOURNAL OF NUCLEAR SCIENCE AND TECHNOLOGY, 2016, 53 (01) : 102 - 111
  • [24] Research on characteristics of communication content of operation crew in digital main control room of nuclear power plant
    School of Nuclear Science and Technology, University of South China, Hengyang
    421001, China
    不详
    421002, China
    不详
    421001, China
    Yuanzineng Kexue Jishu, 4 (750-754):
  • [25] Ergonomic field studies in a nuclear power plant control room
    De Carvalho, PVR
    PROGRESS IN NUCLEAR ENERGY, 2006, 48 (01) : 51 - 69
  • [26] Human-centered automation for resilient nuclear power plant outage control
    Zhang, Cheng
    Tang, Pingbo
    Cooke, Nancy
    Buchanan, Verica
    Yilmaz, Alper
    Germain, Shawn W. St.
    Boring, Ronald Laurids
    Akca-Hobbins, Saliha
    Gupta, Ashish
    AUTOMATION IN CONSTRUCTION, 2017, 82 : 179 - 192
  • [27] Fukushima Nuclear Power Plant Accident and Nuclear Physicists
    Otsuka, Takaharu
    INPC 2013 - INTERNATIONAL NUCLEAR PHYSICS CONFERENCE, VOL. 2, 2014, 66
  • [28] Study on dynamic evolution of operators' behavior in digital nuclear power plant main control room - Part I: Qualitative analysis
    Zou, Yanhua
    Zhang, Li
    SAFETY SCIENCE, 2015, 80 : 296 - 300
  • [29] Workload measurement using physiological and activity measures for validation test: A case study for the main control room of a nuclear power plant
    Gan, Yu
    Dong, Xiaolu
    Zhang, Yijing
    Zhang, Xuegang
    Jia, Ming
    Liu, Zhaopeng
    Li, Zhizhong
    INTERNATIONAL JOURNAL OF INDUSTRIAL ERGONOMICS, 2020, 78 (78)
  • [30] OUTAGE MANAGEMENT AT BARSEBACK-NUCLEAR-POWER-PLANT
    BERGSTROM, L
    QUALITY IN NUCLEAR POWER PLANT OPERATION: LEARNING FROM EACH OTHER, 1989, : 141 - 144