共 50 条
- [32] Blasting to the rescue, underwater concrete bridge-pier demolition PROCEEDINGS OF THE TWENTY-FIFTH ANNUAL CONFERENCE ON EXPLOSIVES AND BLASTING TECHNIQUE, VOL I, 1999, : 217 - 224
- [33] A Study on Stress-Strain Testing of Controlled Blasting Demolition of 210m Chimney 2014 7TH INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION TECHNOLOGY AND AUTOMATION (ICICTA), 2014, : 41 - 44
- [34] Vibration Reduction Technology for Directional Blasting Demolition of 210m Chimney in Complex Environment 2013 FIFTH INTERNATIONAL CONFERENCE ON MEASURING TECHNOLOGY AND MECHATRONICS AUTOMATION (ICMTMA 2013), 2013, : 1303 - 1305
- [35] Analysis on concrete neutralization and life evaluation of reinforced concrete chimney CONSTRUCTION AND URBAN PLANNING, PTS 1-4, 2013, 671-674 : 1672 - +
- [37] Dynamic response of concrete frame structure under a blasting demolition environment Electronic Journal of Geotechnical Engineering, 2014, 19 (Z7): : 17823 - 17837
- [38] Time-constrained demolition of a concrete cofferdam using controlled blasting Innovative Infrastructure Solutions, 2021, 6
- [39] Demolition of a complex Brick-structure chimney with a Height of 56 meters without recoil by demolitional blasting PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 1078 - 1081
- [40] Experiences of drilling and blasting of heavily reinforced concrete EXPLOSIVES & BLASTING TECHNIQUE, 2000, : 343 - 346