Evaluation of Shewhart time-between-events-and-amplitude control charts for correlated data

被引:9
|
作者
Rahali, Dorra [1 ,2 ,3 ,4 ]
Castagliola, Philippe [1 ,2 ]
Taleb, Hassen [4 ,5 ]
Khoo, Michael Boon Chong [6 ]
机构
[1] Univ Nantes, Nantes, France
[2] LS2N UMR CNRS 6004, Nantes, France
[3] Univ Tunis, Tunis, Tunisia
[4] ARBRE Lab, Tunis, Tunisia
[5] Univ Carthage, Inst Super Commerce & Comptabilite, Tunis, Tunisia
[6] Univ Sains Malaysia, Sch Math Sci, George Town, Malaysia
关键词
amplitude; copulas; machine breakdowns; statistical process monitoring; time between events; CUSUM CHART; MAGNITUDE; FREQUENCY; MODEL;
D O I
10.1002/qre.2731
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In recent years, several techniques based on control charts have been developed for thesimultaneousmonitoring of the time intervalTand the amplitudeXof events, known as time-between-events-and-amplitude (TBEA) charts. However, the vast majority of the existing works have some limitations. First, they usually focus on statistics based on the ratioXT, and second, they only investigate a reduced number of potential distributions, that is, the exponential distribution forTand the normal distribution forX. Moreover, until now, very few research papers have considered the potential dependence betweenTandX. In this paper, we investigate three different statistics, denoted asZ(1),Z(2), andZ(3), for monitoring TBEA data in the case of three potential distributions (gamma, normal, and Weibull), for bothTandX, using copulas as a mechanism to model the dependence. An illustrative example considering times between machine breakdowns and associated maintenance illustrates the use of TBEA control charts.
引用
收藏
页码:219 / 241
页数:23
相关论文
共 50 条
  • [21] Economic design of Shewhart control charts for monitoring autocorrelated data with skip sampling strategies
    Franco, Bruno Chaves
    Celano, Giovanni
    Castagliola, Philippe
    Costa, Antonio Fernando Branco
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2014, 151 : 121 - 130
  • [22] Shewhart control charts to detect mean and standard deviation shifts based on grouped data
    Steiner, SH
    Geyer, PK
    Wesolowsky, GO
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 1996, 12 (05) : 345 - 353
  • [23] Comparative Study Between the Shewhart and CUSUM Charts for the Statistic Control of Electrostatic Separation Processes
    Senouci, K.
    Bendaoud, A.
    Medles, K.
    Tilmatine, A.
    Dascalescu, L.
    2008 IEEE INDUSTRY APPLICATIONS SOCIETY ANNUAL MEETING, VOLS 1-5, 2008, : 71 - +
  • [24] Synthetic-Type Control Charts for Time-Between-Events Monitoring
    Yen, Fang Yen
    Chong, Khoo Michael Boon
    Ha, Lee Ming
    PLOS ONE, 2013, 8 (06):
  • [25] Performance measures of discrete and continuous time-between-events control charts
    Rizzo, Caterina
    Chin, Swee-Teng
    van den Heuvel, Edwin
    Di Bucchianico, Alessandro
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2020, 36 (08) : 2754 - 2768
  • [26] Boxplot-based phase I control charts for time between events
    Dovoedo, Y. H.
    Chakraborti, S.
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2012, 28 (01) : 123 - 130
  • [27] STATISTICAL CONTROL OF ELECTROSTATIC SEPARATION PROCESSES Comparative study between the Shewhart and CUSUM charts
    Senouci, Khouira
    Bendaoud, Abdelber
    Medles, Karim
    Tilmatine, Amar
    Dascalescu, Lucian
    IEEE INDUSTRY APPLICATIONS MAGAZINE, 2010, 16 (04) : 22 - 27
  • [29] Cumulative Sum Control Charts for Monitoring Weibull-distributed Time Between Events
    Shafae, Mohammed S.
    Dickinson, Rebecca M.
    Woodall, William H.
    Camelio, Jaime A.
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2015, 31 (05) : 839 - 849
  • [30] One-Sided Modified EWMA Control Charts for Monitoring Time Between Events
    Niaz, Attiya
    Khan, Majid
    Ijaz, Muhammad
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2025,