Minimizing transportation and installation costs for turbines in offshore wind farms

被引:59
|
作者
Sarker, Bhaba R. [1 ]
Ibn Faiz, Tasnim [1 ]
机构
[1] Louisiana State Univ, Dept Mech & Ind Engn, Baton Rouge, LA 70803 USA
关键词
Offshore wind farm; Transportation; Installation process; Repair; Maintenance; Cost minimization; OPTIMIZATION; FRAMEWORK; DESIGN; SYSTEM; LAYOUT;
D O I
10.1016/j.renene.2016.09.014
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Building an offshore wind energy facility is an undertaking of large capital investment. The cost of such transportation and installation depends on the time to complete these processes. The cost can be minimized by an optimum selection of variables of transportation and installation operations such as onshore pre-assembly of turbines and their rated power outputs. Other factors such as learning rates for lifting and assembly operation, port-to-farm site distance, vessel deck area and lifting rate of the vessel crane have significant effects on the system cost. A model based on these costs is developed for wind turbine installation and transportation in an offshore wind farm, and the impact of decision variables on total cost of transportation and installation is investigated here. The effects of wind farm and vessel parameters on cost are studied such that an optimal set of system parameters is chosen to minimize the total cost of transportation and installation. A numerical analysis is performed to illustrate the model and to understand the general behavior of different system parameters. The results show that the total cost is significantly impacted by turbine size and pre-assembly method. Also, the scheduled maintenance help reduce the cost significantly that the unscheduled maintenance. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:667 / 679
页数:13
相关论文
共 50 条
  • [21] Development of a risk analysis model for the installation of offshore wind farms
    Munoz, N. Garcia
    Lange, A. K.
    Kaczenski, J.
    Wiggert, M.
    [J]. EERA DEEPWIND CONFERENCE 2023, 2023, 2626
  • [22] Field experiments on wet tows of an integrated transportation and installation vessel with two bucket foundations for offshore wind turbines
    Zhang, Puyang
    Han, Yanqing
    Ding, Hongyan
    Zhang, Siyu
    [J]. OCEAN ENGINEERING, 2015, 108 : 769 - 777
  • [23] Wake losses optimization of offshore wind farms with moveable floating wind turbines
    Rodrigues, S. F.
    Pinto, R. Teixeira
    Soleimanzadeh, M.
    Bosman, Peter A. N.
    Bauer, P.
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2015, 89 : 933 - 941
  • [24] Distributed Complementary Control Research of Wind Turbines in Two Offshore Wind Farms
    Wang, Bing
    Tian, Min
    Lin, Tingjun
    Hu, Yinlong
    [J]. SUSTAINABILITY, 2018, 10 (02)
  • [25] Optimization of Wind Turbines Placement in Offshore Wind Farms: Wake Effects Concerns
    Baptista, Jose
    Lima, Filipe
    Cerveira, Adelaide
    [J]. OPTIMIZATION, LEARNING ALGORITHMS AND APPLICATIONS, OL2A 2021, 2021, 1488 : 102 - 109
  • [26] Mixed Installation to Optimize the Position and Type Selection of Turbines for Wind Farms
    Tang, Xiaoyu
    Shen, Yun
    Li, Siliang
    Yang, Qinmin
    Sun, Youxian
    [J]. NEURAL INFORMATION PROCESSING (ICONIP 2017), PT VI, 2017, 10639 : 307 - 315
  • [27] PRELIMINARY ANALYSIS ON INTEGRATED TRANSPORTATION TECHNIQUE FOR OFFSHORE WIND TURBINES
    Zhang Puyang
    Ding Hongyan
    Le Conghuan
    Zhang Siyu
    Huang Xu
    [J]. PROCEEDINGS OF THE ASME 32ND INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING - 2013 - VOL 8, 2013,
  • [28] Suction installation and leveling of composite bucket foundation for offshore wind turbines
    Lian, Jijian
    Chen, Fei
    Yang, Xu
    Wang, Haijun
    [J]. Tianjin Daxue Xuebao (Ziran Kexue yu Gongcheng Jishu Ban)/Journal of Tianjin University Science and Technology, 2014, 47 (11): : 987 - 993
  • [29] Motion analysis on integrated transportation technique for offshore wind turbines
    Zhang, Puyang
    Ding, Hongyan
    Le, Conghuan
    Huang, Xu
    [J]. JOURNAL OF RENEWABLE AND SUSTAINABLE ENERGY, 2013, 5 (05)
  • [30] A model proposal for selecting the installation location of offshore wind energy turbines
    Mehmet Kabak
    Sinem Akalın
    [J]. International Journal of Energy and Environmental Engineering, 2022, 13 : 121 - 134