Retrofit design of a boil-off gas handling process in liquefied natural gas receiving terminals

被引:55
|
作者
Park, Chansaem [1 ]
Song, Kiwook [1 ]
Lee, Sangho [1 ]
Lim, Youngsub [1 ]
Han, Chonghun [1 ]
机构
[1] Seoul Natl Univ, Sch Chem & Biol Engn, Seoul 151742, South Korea
关键词
Boil-off gas; LNG receiving terminal; Retrofit design; Cryogenic energy; BOG handling; COLD ENERGY; OPERATION; EXERGY;
D O I
10.1016/j.energy.2012.02.053
中图分类号
O414.1 [热力学];
学科分类号
摘要
Generation of Boil-off gas (BOG) in liquefied natural gas (LNG) receiving terminals considerably affects operating costs and the safety of the facility. For the above reasons, a proper BOG handling process is a major determinant in the design of a LNG receiving terminal. This study proposes the concept of a retrofit design for a BOG the handling process using a fundamental analysis. A base design was determined for a minimum send-out case in which the BOG handling becomes the most difficult. In the proposed design, the cryogenic energy of the LNG stream is used to cool other streams inside the process. It leads to a reduction in the operating costs of the compressors in the BOG handling process. Design variables of the retrofit design were optimized with non-linear programming to maximize profitability. Optimization results were compared with the base design to show the effect of the proposed design. The proposed design provides a 22.7% energy saving ratio and a 0.176 year payback period. (C) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:69 / 78
页数:10
相关论文
共 50 条
  • [21] A novel boil-off gas reliquefaction system using liquid air for intercontinental liquefied natural gas transportation
    Mun, Haneul
    Kim, Hyeonchul
    Park, Jinwoo
    Lee, Inkyu
    ENERGY CONVERSION AND MANAGEMENT, 2022, 269
  • [22] Thermodynamic-Analysis-Based Design and Operation for Boil-Off Gas Flare Minimization at LNG Receiving Terminals
    Liu, Chaowei
    Zhang, Jian
    Xu, Qiang
    Gossage, John L.
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2010, 49 (16) : 7412 - 7420
  • [23] Dynamic Simulation for Improving the Performance of Boil-Off Gas Recondensation System at LNG Receiving Terminals
    Li, Yajun
    Chen, Xingshui
    CHEMICAL ENGINEERING COMMUNICATIONS, 2012, 199 (10) : 1251 - 1262
  • [24] Design and optimization of boil-off gas recondensation process by recovering waste cold energy in LNG regasification terminals
    Srilekha, Malayanur
    Dutta, Arnab
    CHEMICAL ENGINEERING RESEARCH & DESIGN, 2024, 205 : 292 - 300
  • [25] Application of Boil Off Gas Compressors in Liquefied Natural Gas Plants
    Chaker, Mustapha
    Meher-Homji, Cyrus B.
    Pillai, Pradeep
    Bhattacharya, Dipanjan
    Messersmith, David
    JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 2015, 137 (04):
  • [26] Design of a boil-off natural gas reliquefaction control system for LNG carriers
    Shin, Younggy
    Lee, Yoon Pyo
    APPLIED ENERGY, 2009, 86 (01) : 37 - 44
  • [27] Thermodynamic Analysis-Based Improvement for the Boil-off Gas Reliquefaction Process of Liquefied Ethylene Vessels
    Li, Yajun
    Jin, Guang
    Zhong, Zhiliang
    CHEMICAL ENGINEERING & TECHNOLOGY, 2012, 35 (10) : 1759 - 1764
  • [28] Conceptual process design and optimization of refrigeration cycles for the liquefaction of boil-off gas
    Son H.
    Cho H.
    Gim M.
    Yoon S.
    Jang M.-G.
    Kwak D.-H.
    Kim J.-K.
    Chemical Engineering Transactions, 2018, 70 : 169 - 174
  • [29] Managing Jetty Boil-Off Gas for More Sustainable LNG Export Terminals
    Bouabidi, Zineb
    Al-Musleh, Easa I.
    Al Momani, Fares
    Al-Sobhi, Saad
    Karimi, Iftekhar A.
    ACS SUSTAINABLE CHEMISTRY & ENGINEERING, 2024, 12 (32): : 11997 - 12013
  • [30] A Novel Boil-Off Gas Re-Liquefaction Using a Spray Recondenser for Liquefied Natural-Gas Bunkering Operations
    Ryu, Jiheon
    Lee, Chihun
    Seo, Yutaek
    Kim, Juneyoung
    Seo, Suwon
    Chang, Daejun
    ENERGIES, 2016, 9 (12)