Circle geometric constraint model for open-pit mine ore-matching and its applications

被引:1
|
作者
Huang Jun-xin [1 ,2 ]
Wang Li-guan [1 ]
Xiong Shu-min [1 ]
Xu Shao-you [1 ]
Tan Zheng-hua [1 ]
Wang Hai-qiao [3 ]
机构
[1] Cent S Univ, Sch Resources & Safety Engn, Changsha 410083, Peoples R China
[2] Hunan Inst Technol, Dept Safety & Environm Engn, Hengyang 421001, Peoples R China
[3] Hunan Univ Sci & Technol, Sch Energy & Safety Engn, Xiangtan 411201, Peoples R China
基金
国家高技术研究发展计划(863计划); 中国国家自然科学基金;
关键词
open-pit mine; block model; blasted-pile mining optimization; linear programming; mixed integer programming (MIP);
D O I
10.1007/s11771-012-1316-7
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
The circle geometric constraint model (CGCM) was put forward for resolving the open-pit mine ore-matching problems (OMOMP). By adopting the approaches of graph theory, block model of blasted piles was abstracted into a set of nodes and directed edges, which were connected together with other nodes in the range of circle constraints, to describe the mining sequence. Also, the constructing method of CGCM was introduced in detail. The algorithm of CGCM has been realized in the DIMINE system, and applied to a short-term (5 d) program calculation for ore-matching of a cement limestone mine in Hebei Province, China. The applications show that CGCM can well describe the mining sequence of ore blocks and its mining geometric constraints in the process of mining blasted piles. This model, which is applicable for resolving OMOMP under complicated geometric constraints with accurate results, provides effective ways to solve the problems of open-pit ore-matching.
引用
收藏
页码:2598 / 2603
页数:6
相关论文
共 50 条
  • [21] Formula optimization of dust coagulation agent for application in open-pit iron ore mine blasting
    Ma, E. W.
    Wu, Q. S.
    Wu, X. Y.
    Lang, Q. C.
    Cui, Z. J.
    ADVANCES IN ENERGY, ENVIRONMENT AND MATERIALS SCIENCE, 2016, : 581 - 585
  • [22] THE USE OF A CAVED BLOCK AS AN ORE PASS AND ITS APPLICATION TO OPEN-PIT MINING
    WEED, HC
    TRANSACTIONS OF THE AMERICAN INSTITUTE OF MINING AND METALLURGICAL ENGINEERS, 1953, 196 (09): : 886 - 889
  • [23] PHYSICAL MODELING OF NATURAL WIND AND ITS GUIDE IN A LARGE OPEN-PIT MINE
    PENG, X
    LU, GR
    JOURNAL OF WIND ENGINEERING AND INDUSTRIAL AERODYNAMICS, 1995, 54 : 473 - 481
  • [24] Instrumental deformation monitoring system and its trial in open-pit diamond mine
    S. A. Bornyakov
    D. V. Salko
    Journal of Mining Science, 2016, 52 : 388 - 393
  • [25] Block size selection and its impact on open-pit design and mine planning
    Jara, RM
    Couble, A
    Emery, X
    Magri, EJ
    Ortiz, JM
    JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 2006, 106 (03): : 205 - 211
  • [26] Instrumental deformation monitoring system and its trial in open-pit diamond mine
    Bornyakov, S. A.
    Salko, D. V.
    JOURNAL OF MINING SCIENCE, 2016, 52 (02) : 388 - 393
  • [27] A Mine-to-Crusher Model to Minimize Costs at a Truckless Open-Pit Iron Mine in Brazil
    Navarro Torres, Vidal Felix
    Figueiredo, Janine Rodrigues
    De La Hoz, Raul Carretero
    Botaro, Marcio
    Chaves, Leonardo Soares
    MINERALS, 2022, 12 (08)
  • [28] Model studies of an open-pit mine bottom loaded by artesian water pressure
    Trckova, J
    ENVIRONMENTAL GEOLOGY, 1998, 35 (04): : 245 - 250
  • [29] Research on Comprehensive Evaluation Model of a Truck Dispatching System in Open-Pit Mine
    Kou, Xiangyu
    Xie, Xuebin
    Zou, Yi
    Kang, Qian
    Liu, Qi
    SUSTAINABILITY, 2022, 14 (15)
  • [30] An integrated model of an open-pit coal mine: improving energy efficiency decisions
    Patterson, S. R.
    Kozan, E.
    Hyland, P.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (14) : 4213 - 4227