Planning for computer integrated construction

被引:53
|
作者
Jung, YS [1 ]
Gibson, GE [1 ]
机构
[1] Univ Texas, Dept Civil Engn, Austin, TX 78712 USA
关键词
D O I
10.1061/(ASCE)0887-3801(1999)13:4(217)
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Computer integrated construction (CIC) has recently evolved to maximize the integrated utilization of information systems throughout the project's entire life cycle and across different business functions. CIC is a broad and strategic concept, not a specific system. Complicating CIC solutions are the dynamics of business requirements and technology development. It is difficult, therefore, to design systems that are based on the available technology, resources, needs, and benefits. This situation calls for an effective CIC planning methodology, particularly on a company level. This paper proposes a planning methodology that incorporates comprehensive issues for real-world CIC implementation. Measures and factors influencing information systems assessment are investigated. To represent the complex measurements in a simplified manner, a CIC portfolio is also developed. Managerial issues are stressed throughout the planning process to help make CIC more viable and efficient. A case study using this methodology is presented.
引用
收藏
页码:217 / 225
页数:9
相关论文
共 50 条
  • [41] A conceptual model for integrated computer-aided urban planning
    Hammad, A
    Osman, O
    Hayashi, Y
    Yokoi, S
    PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON COMPUTING IN CIVIL AND BUILDING ENGINEERING, VOLS 1-4, 1997, : 753 - 758
  • [42] THCAPP: Computer Aided Process Planning System in an Integrated Environment
    王先逵
    刘成颖
    李志忠
    张玉云
    Tsinghua Science and Technology, 1996, (02) : 119 - 123
  • [44] INTEGRATED PIPELINE ROUTING BY COMPUTER IN CHEMICAL-PLANT CONSTRUCTION
    LANG, G
    ROPER, O
    CHEMIE INGENIEUR TECHNIK, 1984, 56 (05) : 413 - 413
  • [45] COMPUTER-INTEGRATED DESIGN DRAWINGS AND CONSTRUCTION PROJECT PLANS
    PARFITT, MK
    SYAL, MG
    KHALVATI, M
    BHATIA, S
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1993, 119 (04): : 729 - 742
  • [46] An advanced groupware approach for an integrated planning process in building construction
    Muller, C
    CAAD FUTURES 1997, 1997, : 475 - 480
  • [47] Development of an integrated system for planning earthwork operations in road construction
    Alkass, Sabah
    Harris, Frank
    Construction Management and Economics, 1991, 9 (03) : 263 - 289
  • [48] Integrated Planning Approach for Optimizing Tower Crane and Truck Locations in Modular Integrated Construction
    Wang, Roy Dong
    Zayed, Tarek
    Eltoukhy, Abdelrahman E. E.
    Wu, Hengqin
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (09)
  • [49] COMPUTER-AIDED PLANNING SYSTEMS FOR INTEGRATED ELECTRONIC AND MECHANICAL DESIGN
    FELDMANN, K
    FRANKE, J
    IEEE TRANSACTIONS ON COMPONENTS HYBRIDS AND MANUFACTURING TECHNOLOGY, 1993, 16 (04): : 377 - 383
  • [50] PDM-integrated computer-aided assembly process planning
    Bowland, W
    Gao, J
    16TH INTERNATIONAL CONFERENCE ON COMPUTER-AIDED PRODUCTION ENGINEERING - CAPE 2000, 2000, 2000 (05): : 307 - 316