TWO-STAGE SUPPLY CHAIN INVENTORY SYSTEM CONSIDERING PRODUCTION POSTPONEMENT AND REWORK

被引:0
|
作者
Huang, Yen-Deng [1 ,2 ]
Chung, Rih-Lung [3 ]
Cheng, Yung-Lung [4 ]
Wee, Hui-Ming [3 ]
机构
[1] Natl Pingtung Univ, Dept Mkt & Distribut Management, Pingtung, Taiwan
[2] Chang Jung Christian Univ, Bachelors Degree Program Management, Tainan, Taiwan
[3] Chung Yuan Christian Univ, Dept Ind & Syst Engn, Chungli, Taiwan
[4] Chien Hsin Univ Sci & Technol, Dept Mkt & Distribut Management, Jhongli, Taiwan
关键词
supply chain; inventory system; postponement; rework; IMPERFECT PRODUCTION PROCESSES; PRODUCTION QUANTITY MODEL; BACKORDERS; STRATEGY; QUALITY; TIME;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study proposes a basic framework for a supply chain inventory system considering postponement strategy and reworks policy. We consider a manufacturer that produces a generic component and orders other components from its supplier. The manufacturer then assembles the end-products with generic and other components under different production schedules considering backorder, rework, and scrap issues. Next, we construct a mathematical model for a supply chain system with the postponement and rework. In the model, we have investigated the effects of ordering frequency and production quantity on the total production costs. For comparisons, we have also developed a supply chain model with rework policy for the non-postponement inventory system. Finally, the numerical results are included to illustrate the validity of our proposed inventory system. The system is shown to reduce the scrap rate, improve the production of good items, and reduce the total production costs. Moreover, the proposed system can also reduce the number of ordering cycle, effectively enhance the manufacturer's dispatching ability and improve its responsive ability to drastic demand variations. Therefore, this study provides valuable insights to manage a supply chain with a similar production environment.
引用
收藏
页码:449 / 467
页数:19
相关论文
共 50 条
  • [31] Analysis on a two-stage supply chain with different criteria
    Yu, Tian
    [J]. Proceedings of the 24th Chinese Control Conference, Vols 1 and 2, 2005, : 1722 - 1725
  • [32] Scheduling in a two-stage supply chain with uncertain parameters
    Shen, Jiayu
    Zhu, Yuanguo
    [J]. JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2016, 30 (06) : 3439 - 3449
  • [33] Probability of first passage analysis of a two-stage transfer-line production system with storage and rework
    Indian Inst of Technology, Bombay, India
    [J]. Microelectron Reliab, 3 (403-407):
  • [34] Research on game in two-stage supply chain enterprises
    Suo, Han-Sheng
    Jin, Yi-Hui
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2003, 9 (07): : 546 - 550
  • [35] A production planning model considering uncertain demand using two-stage stochastic programming in a fresh vegetable supply chain context
    Mateo, Jordi
    Pla, Lluis M.
    Solsona, Francesc
    Pages, Adela
    [J]. SPRINGERPLUS, 2016, 5
  • [36] A two-stage model for the design of supply chain networks
    Cakravastia, A
    Toha, IS
    Nakamura, N
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 80 (03) : 231 - 248
  • [37] Delivery performance improvement in two-stage supply chain
    Bushuev, Maxim A.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2018, 195 : 66 - 73
  • [38] A two-stage maritime supply chain optimisation model
    Cheaitou, Ali
    Cariou, Pierre
    [J]. INTERNATIONAL JOURNAL OF SHIPPING AND TRANSPORT LOGISTICS, 2017, 9 (02) : 202 - 233
  • [39] Two-Stage Production System Pondering upon Corporate Social Responsibility in Food Supply Chain: A Case Study
    Chen, Ten-Suz
    Huang, Yung-Fu
    Weng, Ming-Wei
    Do, Manh-Hoang
    [J]. APPLIED SCIENCES-BASEL, 2021, 11 (03): : 1 - 19
  • [40] Probability of first passage analysis of a two-stage transfer-line production system with storage and rework
    Gopalan, MN
    Kannan, S
    [J]. MICROELECTRONICS AND RELIABILITY, 1996, 36 (03): : 403 - 407