Evaluation of the geological condition ahead of the tunnel face by geostatistical techniques using TBM driving data

被引:0
|
作者
Yamamoto, T
Shirasagi, S
Yamamoto, S
Mito, Y
Aoki, K
机构
来源
MODERN TUNNELING SCIENCE AND TECHNOLOGY, VOLS I AND II | 2001年
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In tunnel excavation by TBM, the ground condition ahead of and near the tunnel face is difficult to grasp because the face cannot be observed during tunnel driving. Because of this fact, it has been impossible to fully achieve the high-speed excavation capability of the TBM in ground having complex conditions. Therefore, the authors developed TBM Excavation Control System, the purpose of which is to grasp quickly and precisely, and in real time, the geological condition ahead of and surrounding the tunnel face. The special feature of this system is that the geological condition ahead of the TBM can be predicted with good precision by analyzing by geostatistical techniques both drill logging data from pilot boring and TBM driving data obtained during excavation.
引用
收藏
页码:213 / 218
页数:6
相关论文
共 50 条
  • [41] Laboratory simulations on hybrid non-destructive survey of electrical resistivity and induced polarization to predict geological risks ahead of a TBM tunnel
    Kang, Minkyu
    Lee, Junho
    Kwon, Kibeom
    Park, Sangyeong
    Choi, Hangseok
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2023, 135
  • [42] Analysis of genebank evaluation data by using geostatistical methods
    Hartung, K
    Piepho, HP
    Knüpffer, H
    GENETIC RESOURCES AND CROP EVOLUTION, 2006, 53 (04) : 737 - 751
  • [43] Analysis of Genebank Evaluation Data by using Geostatistical Methods
    Karin Hartung
    Hans-Peter Piepho
    Helmut Knüpffer
    Genetic Resources and Crop Evolution, 2006, 53 : 737 - 751
  • [44] A review of three geostatistical techniques for realistic geological reservoir modeling integrating multi-scale data
    Doligez, Brigitte
    Le Ravalec, Mickaele
    Bouquet, Sarah
    Adelinet, Mathilde
    BULLETIN OF CANADIAN PETROLEUM GEOLOGY, 2015, 63 (04) : 277 - 286
  • [45] Geological ahead-prospecting method while TBM drilling using improved seismic interferometry method: A case
    Chen, Lei
    Hao, Lei
    Xu, Xinji
    Zhang, Fengkai
    Wang, Rui
    JOURNAL OF APPLIED GEOPHYSICS, 2023, 215
  • [46] Automated rock mass condition assessment during TBM tunnel excavation using deep learning
    Liang Chen
    Zhitao Liu
    Hongye Su
    Fulong Lin
    Weijie Mao
    Scientific Reports, 12
  • [47] Automated rock mass condition assessment during TBM tunnel excavation using deep learning
    Chen, Liang
    Liu, Zhitao
    Su, Hongye
    Lin, Fulong
    Mao, Weijie
    SCIENTIFIC REPORTS, 2022, 12 (01)
  • [48] Quantifying tunneling risks ahead of TBM using Bayesian inference on continuous seismic data
    Fang, Gang
    Nilot, Enhedelihai Alex
    Li, Yunyue Elita
    Tan, Yun Zhou
    Cheng, Arthur
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2024, 147
  • [49] Microclimatic Evaluation of Five Types of Colombian Greenhouses Using Geostatistical Techniques
    Villagran, Edwin
    Flores-Velazquez, Jorge
    Akrami, Mohammad
    Bojaca, Carlos
    SENSORS, 2022, 22 (10)
  • [50] USE OF GEOSTATISTICAL TECHNIQUES FOR THE EVALUATION OF TEMPORAL VARIATION IN GROUNDWATER TABLE DEPTH DATA
    DAHIYA, IS
    HOODA, PS
    LAURA, RD
    AGRAWAL, RP
    INTERNATIONAL JOURNAL OF TROPICAL AGRICULTURE, 1989, 7 (3-4): : 159 - 172