Research on Power Benefits Assessment of SiPing Hydropower Station under the Operation of Sanliping Hydropower Station

被引:2
|
作者
Tian Yu [1 ]
Lei Xiaohui [2 ]
Yu Qian [3 ]
Sun Jialan [1 ,2 ]
机构
[1] Tianjin Univ, Sch Civil Engn, Tianjin 300072, Peoples R China
[2] China Inst Water Resources & Hydropower Res, Beijing 100044, Peoples R China
[3] Beijing IWHR Technol Co Ltd, Beijing 100038, Peoples R China
关键词
Cascaded Optimal Operation; Long-term Operation; Stored Energy Loss; Hydropower Benefit; SiPing Hydropower Station; OPTIMIZATION;
D O I
10.1016/j.phpro.2012.02.074
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In order to research on the effect on the hydropower benefits of SiPing Hydropower station by SaLiPing hydropower station in operation, cascaded optimal operation model has been established, with the objective function of maximizing minimum power and maximizing the generated energy capacity respectively, 0.5 times power probability is selected as system power constraint. The hydropower benefits is SiPing hydropower station is calculated before and after SanLiPing in operation. The result shows that after SanLiPing in operation, the hydropower benefits in SiPing are improved through the compensation of SanLiPing, as well as its flood control condition, brought huge economic benefits to cascaded hydropower stations. (C) 2011 Published by Elsevier B. V. Selection and/or peer-review under responsibility of ICAPIE Organization Committee.
引用
收藏
页码:512 / 517
页数:6
相关论文
共 50 条
  • [31] Optimal Operation of Hydropower Station Unit Based on New Algorithm
    Zhao Xuehua
    Huang Qiang
    Wu Jianhua
    [J]. 2010 8TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2010, : 2216 - 2219
  • [32] Research on Landslide Accumulation Mass Stability at a Hydropower Station
    Du, Jing
    Zhao, Yanxi
    [J]. ADVANCES IN HYDROLOGY AND HYDRAULIC ENGINEERING, PTS 1 AND 2, 2012, 212-213 : 981 - +
  • [33] The Hydropower Station Output Function and its Application in Reservoir Operation
    Li Chuangang
    Ji Changming
    Wang Boquan
    Liu Minghao
    Li Rongbo
    [J]. Water Resources Management, 2017, 31 : 159 - 172
  • [34] The Hydropower Station Output Function and its Application in Reservoir Operation
    Li Chuangang
    Ji Changming
    Wang Boquan
    Liu Minghao
    Li Rongbo
    [J]. WATER RESOURCES MANAGEMENT, 2017, 31 (01) : 159 - 172
  • [36] Establishment and evaluation of operation function model for cascade hydropower station
    Ji, Chang-ming
    Zhou, Ting
    Huang, Hai-tao
    [J]. WATER SCIENCE AND ENGINEERING, 2010, 3 (04) : 443 - 453
  • [37] Research on initial stress field of Baihetan hydropower station
    Jin Chang-yu
    Feng Xia-ting
    Zhang Chun-sheng
    [J]. ROCK AND SOIL MECHANICS, 2010, 31 (03) : 845 - +
  • [38] Establishment and evaluation of operation function model for cascade hydropower station
    Chang-ming JI 1
    [J]. Water Science and Engineering, 2010, 3 (04) : 443 - 453
  • [40] Selection of installed capacity of gezhouba hydropower station and its operation
    Xiang, Ming
    [J]. Ren Min Chang Jiang/Yangtze River, 1995, 26 (02):