Project management under uncertainty: resource flexibility visualization in the schedule

被引:4
|
作者
Lima, Ricardo [1 ,2 ]
Tereso, Anabela [2 ]
Faria, Joao [2 ]
机构
[1] Fed Inst Goias, Informat Technol Res Grp NETI, BR-74400000 Inhumas, Brazil
[2] Univ Minho, Produt & Syst Dept, Ctr ALGORITMI, Campus Azurem, P-4804533 Guimaraes, Portugal
关键词
RCPSP-FRM; resource flexibility; project management; PLATFORM IMPLEMENTATION; ALLOCATION; CLASSIFICATION; MODELS; ROBUST;
D O I
10.1016/j.procs.2019.12.197
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Going from an idea to a result, using a series of well-defined techniques with deadlines and limited resources, is a skill that a project manager must have. In a rapidly changing environment like the present one, there are many factors that contribute to budget overruns and delays that occur in most major projects. To be successful, one must rely on techniques and tools that assist the project manager in the various stages of the project. Therefore, this paper presents an Add-In for MS Project, based on a previously developed model for solving the Resource Constraint Project Scheduling Problem with Flexible Resource Management (RCPSP-FRM), which can help the project manager with regard to the scheduling of resources using flexibility, giving him relevant information to the decision making process in case of delays during the execution phase. The flexible chart and table format view allows project managers to easily and objectively identify the activities which can have their durations increased or shortened, impacting significantly on project execution time. This research contributes not only to the academic environment, but also to professional project management environments. (C) 2019 The Authors. Published by Elsevier B.V. This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/) Peer-review under responsibility of the scientific committee of the CENTERIS -International Conference on ENTERprise Information Systems / ProjMAN - International Conference on Project MANagement / HCist - International Conference on Health and Social Care Information Systems and Technologies.
引用
收藏
页码:381 / 388
页数:8
相关论文
共 50 条
  • [1] Project management under uncertainty: using flexible resource management to exploit schedule flexibility
    Faria, Joao
    Araujo, Madalena
    Demeulemeester, Erik
    Tereso, Anabela
    [J]. EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2020, 14 (05) : 599 - 631
  • [2] Methods and Models of Project Resource Management under Uncertainty
    Kosorukov, O. A.
    Lemtyuzhnikova, D. V.
    Mishchenko, A. V.
    [J]. JOURNAL OF COMPUTER AND SYSTEMS SCIENCES INTERNATIONAL, 2023, 62 (02) : 304 - 322
  • [3] Methods and Models of Project Resource Management under Uncertainty
    O. A. Kosorukov
    D. V. Lemtyuzhnikova
    A. V. Mishchenko
    [J]. Journal of Computer and Systems Sciences International, 2023, 62 : 304 - 322
  • [4] Contemporary Human Resource Management Practices in Russia: Flexibility under Uncertainty
    Kabalina, Veronika
    Zelenova, Olga
    Reshetnikova, Kira
    [J]. INTERNATIONAL STUDIES OF MANAGEMENT & ORGANIZATION, 2019, 49 (04) : 422 - 440
  • [5] The Assignment Problem in Human Resource Project Management under Uncertainty
    Gaspars-Wieloch, Helena
    [J]. RISKS, 2021, 9 (01) : 1 - 17
  • [6] Multi-project scheduling under uncertainty and resource flexibility: a systematic literature review
    Aghileh, Marzieh
    Tereso, Anabela
    Alvelos, Filipe
    Monteiro Lopes, Maria Odete
    [J]. PRODUCTION AND MANUFACTURING RESEARCH-AN OPEN ACCESS JOURNAL, 2024, 12 (01):
  • [7] Project Schedule Expediting under Structural and Parametric Uncertainty
    Nazimko, Victor V.
    Zakharova, Ludmila M.
    [J]. ENGINEERING MANAGEMENT JOURNAL, 2023, 35 (01) : 29 - 49
  • [8] Flexible project management under uncertainty
    Narimatsu, K
    [J]. 1998 JAPAN-U.S.A. SYMPOSIUM ON FLEXIBLE AUTOMATION - PROCEEDINGS, VOLS I AND II, 1998, : 907 - 910
  • [9] Uncertainty Analysis and Resource Allocation in Construction Project Management
    Zhong, Yong
    Chen, Zhigao
    Zhou, Zhong
    Hu, Haibo
    [J]. ENGINEERING MANAGEMENT JOURNAL, 2018, 30 (04) : 293 - 305
  • [10] Freezing the master production schedule under single resource constraint and demand uncertainty
    Xie, JX
    Zhao, XD
    Lee, TS
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2003, 83 (01) : 65 - 84