Exploring Indian post-disaster temporary housing strategy through a comparative review

被引:13
|
作者
Biswas, Arindam [1 ]
机构
[1] Indian Inst Technol Roorkee, Dept Architecture & Planning, Roorkee, Uttarakhand, India
关键词
Tsunami; Community participation; Shelter; Livelihood; Permanent housing; Temporary housing; RECONSTRUCTION; JAPAN; CHALLENGES; EARTHQUAKE; TSUNAMI;
D O I
10.1108/IJDRBE-09-2018-0037
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Purpose Natural disasters not only cause dilapidated buildings and damaged infrastructure but also delay crucial aid for those affected in the event of a disaster and post-disaster recovery. An institutionally well-managed post-disaster housing strategy provides opportunities for physical and mental healing of its occupant. The time requires occupiers to remain in the temporary housing varies with circumstances. This paper aims to review post-disaster housing scenarios in India in comparison to two Asian cases from Indonesia and Japan. The study focuses on understanding Indian post-disaster housing strategies through a comparative review. Design/methodology/approach The research selects coastal cities of Tamil Nadu state, where the post-disaster temporary shelter and rehabilitation was planned and implemented after the Tsunami in 2004. The Tsunami created havoc in Nagapattinam and Kanyakumari district of Tamil Nadu. Nagapattinam district reported 6,051 fatalities and many more homeless people. After the Tsunami, the government took measures to supply safe, secured and on-site shelter provisions. Surprisingly, many such shelters were never occupied. In many instances, people actually preferred to spend years in a temporary shelter rather occupying government housing. This paper evaluates such events and investigates India's post-disaster shelter strategy against the derived best practices. This study is based on the sequential/logical reasoning and understanding of the facts. Discussions and findings from this study can be further generalised into a comprehensive policy discussion. Findings The paper finds that the manner of planning and design of post-disaster housing programmes influence medium- to long-term recovery of its occupant. A certain element of trade-off between implementation and quality of habitation results into compromises to achieving the desired outcome. When faced with socio-political, economic and financial constraints, the decision-makers are required to make trade-offs in deciding the manner and quantum of allocating resources. Coordination among these agencies is troublesome. It is true for all countries and there is no distinct answer to it. Public consultation and community participation in long-term rehabilitation are crucial to meet the aspiration of the local people. Originality/value The paper contributes in discussing a comparison of post-disaster housing rehabilitation between India and the two cases from Indonesia and Japan. As a review paper, the objective is to highlight the synthesis and overall understanding of post-disaster housing strategies from two cases and compare it with India.
引用
收藏
页码:14 / 35
页数:22
相关论文
共 50 条
  • [1] Comparative Assessment of Indian Post-Disaster Temporary Housing Strategies
    Biswas, Arindam
    Puriya, Anshul
    [J]. JOURNAL OF ARCHITECTURAL ENGINEERING, 2020, 26 (01)
  • [2] Strategic planning for post-disaster temporary housing
    Johnson, Cassidy
    [J]. DISASTERS, 2007, 31 (04) : 435 - 458
  • [3] Origami Housing: A Post-Disaster Temporary Emergency Housing Solution
    Muller, Claudia Calle
    Elzomor, Mohamed
    [J]. CONSTRUCTION RESEARCH CONGRESS 2024: SUSTAINABILITY, RESILIENCE, INFRASTRUCTURE SYSTEMS, AND MATERIALS DESIGN IN CONSTRUCTION, 2024, : 346 - 355
  • [4] Enhancing cultural adequacy in post-disaster temporary housing
    Sukhwani, Vibhas
    Napitupulu, Heriany
    Jingnan, Deng
    Yamaji, Miki
    Shaw, Rajib
    [J]. PROGRESS IN DISASTER SCIENCE, 2021, 11
  • [5] Sustainability of Temporary Housing in Post-Disaster Scenarios: A Requirement-Based Design Strategy
    Montalbano, Giammarco
    Santi, Giovanni
    [J]. BUILDINGS, 2023, 13 (12)
  • [6] An automated system for optimizing post-disaster temporary housing allocation
    El-Anwar, Omar
    El-Rayes, Khaled
    Elnashai, Amr
    [J]. AUTOMATION IN CONSTRUCTION, 2009, 18 (07) : 983 - 993
  • [7] Life-cycle assessment of post-disaster temporary housing
    Atmaca, Nihat
    [J]. BUILDING RESEARCH AND INFORMATION, 2017, 45 (05): : 524 - 538
  • [8] The role of temporary accommodation buildings for post-disaster housing reconstruction
    Daniel Félix
    Daniel Monteiro
    Jorge M. Branco
    Roberto Bologna
    Artur Feio
    [J]. Journal of Housing and the Built Environment, 2015, 30 : 683 - 699
  • [9] A systems view of temporary housing projects in post-disaster reconstruction
    Johnson, Cassidy
    Lizarralde, Gonzalo
    Davidson, Colin H.
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2006, 24 (04) : 367 - 378
  • [10] The role of temporary accommodation buildings for post-disaster housing reconstruction
    Felix, Daniel
    Monteiro, Daniel
    Branco, Jorge M.
    Bologna, Roberto
    Feio, Artur
    [J]. JOURNAL OF HOUSING AND THE BUILT ENVIRONMENT, 2015, 30 (04) : 683 - 699