Strategic planning for post-disaster temporary housing

被引:105
|
作者
Johnson, Cassidy [1 ]
机构
[1] Univ Montreal, Fac Built Environm, IF Res Grp, Montreal, PQ H3C 3J7, Canada
[2] UCL, Dev Planning Unit, London WC1E 6BT, England
关键词
post-disaster reconstruction; strategic planning; temporary housing;
D O I
10.1111/j.1467-7717.2007.01018.x
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Temporary housing programmes suffer from excessively high cost, late delivery, poor location, improper unit designs and other inherent issues. These issues can be attributed in part to a prevalence of ad hoc tactical planning, rather than pre-disaster strategic planning, for reconstruction undertaken by governments and non-governmental organisations (NGOs) in the chaotic post-disaster environment. An analysis of the process and outcomes from six case studies of temporary housing programmes after disasters in Turkey and Colombia in 1999, Japan in 1995, Greece in 1986, Mexico in 1985, and Italy in 1976 yields information about the extent to which strategic planning is employed in temporary housing programmes, as well as common issues in temporary housing. Based on an understanding of these common issues, this paper proposes a framework for strategic planning for temporary housing that identifies organisational designs and available resources for temporary housing before the disaster, but allows modifications to fit the specific post-disaster situation.
引用
收藏
页码:435 / 458
页数:24
相关论文
共 50 条
  • [1] Origami Housing: A Post-Disaster Temporary Emergency Housing Solution
    Muller, Claudia Calle
    Elzomor, Mohamed
    [J]. CONSTRUCTION RESEARCH CONGRESS 2024: SUSTAINABILITY, RESILIENCE, INFRASTRUCTURE SYSTEMS, AND MATERIALS DESIGN IN CONSTRUCTION, 2024, : 346 - 355
  • [2] Enhancing cultural adequacy in post-disaster temporary housing
    Sukhwani, Vibhas
    Napitupulu, Heriany
    Jingnan, Deng
    Yamaji, Miki
    Shaw, Rajib
    [J]. PROGRESS IN DISASTER SCIENCE, 2021, 11
  • [3] Comparative Assessment of Indian Post-Disaster Temporary Housing Strategies
    Biswas, Arindam
    Puriya, Anshul
    [J]. JOURNAL OF ARCHITECTURAL ENGINEERING, 2020, 26 (01)
  • [4] An automated system for optimizing post-disaster temporary housing allocation
    El-Anwar, Omar
    El-Rayes, Khaled
    Elnashai, Amr
    [J]. AUTOMATION IN CONSTRUCTION, 2009, 18 (07) : 983 - 993
  • [5] Life-cycle assessment of post-disaster temporary housing
    Atmaca, Nihat
    [J]. BUILDING RESEARCH AND INFORMATION, 2017, 45 (05): : 524 - 538
  • [6] The role of temporary accommodation buildings for post-disaster housing reconstruction
    Daniel Félix
    Daniel Monteiro
    Jorge M. Branco
    Roberto Bologna
    Artur Feio
    [J]. Journal of Housing and the Built Environment, 2015, 30 : 683 - 699
  • [7] A systems view of temporary housing projects in post-disaster reconstruction
    Johnson, Cassidy
    Lizarralde, Gonzalo
    Davidson, Colin H.
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2006, 24 (04) : 367 - 378
  • [8] The role of temporary accommodation buildings for post-disaster housing reconstruction
    Felix, Daniel
    Monteiro, Daniel
    Branco, Jorge M.
    Bologna, Roberto
    Feio, Artur
    [J]. JOURNAL OF HOUSING AND THE BUILT ENVIRONMENT, 2015, 30 (04) : 683 - 699
  • [9] Designing post-disaster temporary housing inspired by the housing of indigenous nomads of Iran
    Mojahedi, Mohammad Reza
    Vafamehr, Mohsen
    Ekhlassi, Ahmad
    [J]. INTERNATIONAL JOURNAL OF LOW-CARBON TECHNOLOGIES, 2021, 16 (02) : 436 - 446
  • [10] Challenges and Opportunities for Pre-disaster Strategic Planning in Post-disaster Temporary Housing Provision. Evidence from Earthquakes in Central Italy (2016-2017)
    Oggioni, Chiara
    Chelleri, Lorenzo
    Forino, Giuseppe
    [J]. ITALIAN JOURNAL OF PLANNING PRACTICE, 2019, 9 (01): : 96 - 129