Green commercial building projects in Singapore: Critical risk factors and mitigation measures

被引:94
|
作者
Hwang, Bon-gang [1 ]
Shan, Ming [1 ]
Supa'at, Nur Nadiah Binte [2 ]
机构
[1] Natl Univ Singapore, Dept Bldg, 4 Architecture Dr, Singapore 117566, Singapore
[2] Marina Bay Sand, 10 Bayfront Ave, Singapore 018956, Singapore
关键词
Critical risk factors; Green commercial building projects; Risk mitigation measures; Singapore; PRIVATE PARTNERSHIP PROJECTS; CONSTRUCTION PROJECTS; SCHEDULE PERFORMANCE; MANAGEMENT; IDENTIFICATION; PERSPECTIVE; BARRIERS; RANKING; IMPACT;
D O I
10.1016/j.scs.2017.01.020
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Green buildings have achieved rapid development over the past two decades, yet research efforts on risk management in green building projects are still very limited. This study aims to identify and evaluate risk factors in green commercial building projects in Singapore, to compare their risk criticalities with those in traditional counterparts, and to propose mitigation measures that can tackle these risk factors. To achieve these goals, a comprehensive literature review and structured interviews were carried out, and a questionnaire survey was conducted with 25 Singapore-based construction companies. Survey results showed that the top five critical risk factors in green commercial building projects were "inflation," "currency and interest rate volatility worsened by the import of green materials," "durability of green materials," "damages caused by human error," and "shortage of green materials." Results also showed that green commercial building projects faced risks of design change and poor construction quality for less criticality than their traditional counterparts, but that the adoptions of green ideas, materials, and technologies had posed additional risks to green commercial building projects. Additionally, seven widely used risk mitigation measures were also proposed by this study. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:237 / 256
页数:11
相关论文
共 50 条
  • [31] ANALYSIS OF CERTIFIED WOOD PRODUCT USE IN COMMERCIAL LEED GREEN BUILDING PROJECTS
    Estep, G. D.
    DeVallance, D. B.
    Lacombe, D. J.
    WOOD AND FIBER SCIENCE, 2015, 47 (03): : 270 - 282
  • [32] Analysis of certified wood product use in commercial leed green building projects
    Division of Forestry and Natural Resources, United States
    不详
    WV, United States
    Wood Fiber Sci, 3 (270-282):
  • [33] Identifying critical leadership styles of project managers for green building projects
    Zhao, Xianbo
    Hwang, Bon-Gang
    Lee, Hong Ning
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2016, 16 (02) : 150 - 160
  • [34] Managing risk in green building projects: toward a dedicated framework
    Javed, Nida
    Thaheem, Muhammad Jamaluddin
    Bakhtawar, Beenish
    Nasir, Abdur Rehman
    Khan, Khurram Iqbal Ahmad
    Gabriel, Hamza Farooq
    SMART AND SUSTAINABLE BUILT ENVIRONMENT, 2020, 9 (02) : 156 - 173
  • [35] CHECKLIST OF CRITICAL SUCCESS FACTORS FOR BUILDING-PROJECTS - CLOSURE
    PARFITT, MK
    SANVIDO, VE
    JOURNAL OF MANAGEMENT IN ENGINEERING, 1994, 10 (05) : 64 - 64
  • [36] Critical Factors Affecting the Bid Cost of Building Construction Projects
    Shrestha, Kishor
    Shrestha, Pramen P.
    Lohoud, Mohamed
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2023, 15 (03)
  • [37] CHECKLIST OF CRITICAL SUCCESS FACTORS FOR BUILDING-PROJECTS - DISCUSSION
    KLINE, DH
    JOURNAL OF MANAGEMENT IN ENGINEERING, 1994, 10 (05) : 63 - 64
  • [38] Identifying factors and mitigation measures of safety practices for sustainable building construction
    Islam, M. R.
    Nazifa, T. H.
    Priyanka, H. K.
    Ahmed, A.
    Shahid, S.
    SUSTAINABLE BUILT ENVIRONMENT CONFERENCE 2019 TOKYO (SBE19TOKYO) - BUILT ENVIRONMENT IN AN ERA OF CLIMATE CHANGE: HOW CAN CITIES AND BUILDINGS ADAPT?, 2019, 294
  • [39] EXAMINING THE CRITICAL SUCCESS FACTORS FOR THE EFFICIENCY OF GREEN ENERGY PROJECTS
    Kozhakhmetova, A. K.
    Zhidebekkyzy, A.
    Anarkhan, A. K.
    Streimikiene, D.
    POLISH JOURNAL OF MANAGEMENT STUDIES, 2024, 29 (02): : 328 - 345
  • [40] Benefits of Building Information Modeling in Road Projects for Cost Overrun Factors Mitigation
    Sanchez, Omar
    Castaneda, Karen
    Herrera, Rodrigo F.
    Pellicer, Eugenio
    CONSTRUCTION RESEARCH CONGRESS 2022: PROJECT MANAGEMENT AND DELIVERY, CONTRACTS, AND DESIGN AND MATERIALS, 2022, : 472 - 482