共 50 条
- [41] OPTIMIZATION OF THE ACTIVATED-SLUDGE PROCESS BY MINIMIZING THE VOLUME OF AERATION TANKS AND FINAL CLARIFICATION TANKS ACTA HYDROCHIMICA ET HYDROBIOLOGICA, 1983, 11 (01): : 125 - 136
- [43] Identification for model predictive control of biotechnological processes, case study: Nitrogen removal in an activated sludge process (SYSID'97): SYSTEM IDENTIFICATION, VOLS 1-3, 1998, : 1451 - 1456
- [44] NITROGEN REMOVAL BY COMPUTER CONTROL OF A SIMPLE ACTIVATED-SLUDGE PLANT NITROGEN POLLUTION OF WATER, 1988, 6 : 361 - 369
- [47] Intermittent aeration improving activated granular sludge granulation for nitrogen and phosphorus removal from domestic wastewater Bioresource Technology Reports, 2021, 15
- [48] REMOVAL OF NITROGEN BY SIMULTANEOUS NITRIFICATION-DENITRIFICATION IN AN ACTIVATED-SLUDGE PLANT WITH MAMMOTH ROTOR AERATION PROGRESS IN WATER TECHNOLOGY, 1977, 8 (4-5): : 625 - 637
- [50] Alternating Aeration Control And Optimization In Activated Sludge Processes 2024 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION, QUALITY AND TESTING, ROBOTICS, AQTR, 2024, : 229 - 234