Reinforcing the Bridges in Tunnel Excavation Region by Using a Method Combining Jacking Superstructure and Grouting Substructure

被引:0
|
作者
Jin, Bao [1 ]
Liu, Yang [1 ]
机构
[1] Harbin Inst Technol, Sch Transportat Sci & Engn, Harbin 150090, Peoples R China
关键词
Bridge engineering; tunnel engineering; bridge reinforcement; jack-up technique; grouting technique;
D O I
10.4028/www.scientific.net/AEF.5.162
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
It is crucial to alleviate the effect of construction of underground transportation on the safety of the bridges in tunnel excavation region since it is inevitable for the tunnel to go across the city viaduct. To solve above problem, a technique of bridge reinforcement was proposed, which combines the jacking superstructure of bridges and grouting substructure. With this technique, the uneven settlement of the bridge foundation could be controlled as well as the change of the upper structure of bridges could be limited in a reasonable interval. Finally, the effectiveness of proposed method is demonstrated by reinforcing a real bridge in the region of subway construction in Guangzhou, China.
引用
收藏
页码:162 / 166
页数:5
相关论文
共 50 条
  • [31] An iterative inversion method using transient electromagnetic data to predict water-filled caves during the excavation of a tunnel
    Li, Yan
    Qi, Taiyue
    Lei, Bo
    Li, Zongyang
    Qian, Wangping
    GEOPHYSICS, 2019, 84 (02) : E89 - E103
  • [32] Discussion of "Differential settlement remediation for new shield metro tunnel in soft soils using corrective grouting method: case study"
    Shirlaw, J. N.
    CANADIAN GEOTECHNICAL JOURNAL, 2019, 56 (12) : 2018 - 2018
  • [33] Selection of a suitable method for the assessment of excavation damage zone using fuzzy AHP in Aba Saleh Almahdi tunnel, Iran
    Fattahi, Hadi
    Farsangi, Mohammad Ali Ebrahimi
    Shojaee, Saeed
    Mansouri, Hamid
    ARABIAN JOURNAL OF GEOSCIENCES, 2015, 8 (05) : 2863 - 2877
  • [34] Displacement characteristics of high-speed railway tunnel construction in loess ground by using multi-step excavation method
    Li, Pengfei
    Zhao, Yong
    Zhou, Xiaojun
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2016, 51 : 41 - 55
  • [35] Settlement Analysis of Ground Surface and Adjacent Building Caused by Driving and Expansion Excavation of Shield Tunnel Using Artificial Freezing Method
    Guan, Xiaoming
    Wang, Ruohui
    Fu, Hongxian
    Feng, Wei
    Jin, Xin
    Li, Shuqin
    Xu, Shaohui
    Li, Jiguang
    SUSTAINABILITY, 2023, 15 (19)
  • [36] Frozen curtain characteristics during excavation of submerged shallow tunnel using Freeze-Sealing Pipe-Roof method
    Ye Niu
    ZeQun Hong
    Jun Zhang
    Lei Han
    Research in Cold and Arid Regions, 2022, 14 (04) : 259 - 266
  • [37] Excavation-induced hydraulic conductivity reduction around a tunnel - Part 2: Verification of proposed method using numerical modeling
    Fernandez, G.
    Moon, J.
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2010, 25 (05) : 567 - 574
  • [38] Frozen curtain characteristics during excavation of submerged shallow tunnel using Freeze-Sealing Pipe-Roof method
    Niu, Ye
    Hong, ZeQun
    Zhang, Jun
    Han, Lei
    RESEARCH IN COLD AND ARID REGIONS, 2022, 14 (04) : 267 - 273
  • [39] Investigation of seismic performance of high damping rubber bearings for isolated bridges using real-time substructure hybrid loading test method
    Yuan, Yong
    Iemura, Hirokazu
    Igarashi, Akira
    Aoki, Tetsuhiko
    Yamamoto, Yoshihisa
    Doboku Gakkai Ronbunshuu A, 2007, 63 (01) : 265 - 276
  • [40] Back-fill grouting quality evaluation of the shield tunnel using ground penetrating radar with bi-frequency back projection method
    Xie, Xiongyao
    Zhai, Junli
    Zhou, Biao
    AUTOMATION IN CONSTRUCTION, 2021, 121