共 50 条
- [3] Construction of the hybrid cable-stayed bridge [J]. BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE-CYCLE OPTIMIZATION, 2010, : 3328 - 3333
- [5] Analysis on Vertical Swivel Construction of Cable-Stayed Bridge with Steel Arch Pylon [J]. APPLIED MECHANICS AND MATERIALS II, PTS 1 AND 2, 2014, 477-478 : 635 - 639
- [6] Research on Development of Arch Tower Cable-Stayed Bridge [J]. SUSTAINABLE CITIES DEVELOPMENT AND ENVIRONMENT PROTECTION, PTS 1-3, 2013, 361-363 : 1245 - 1250
- [7] On the design and construction of Maysville Cable-Stayed Bridge [J]. 15TH ANNUAL INTERNATIONAL BRIDGE CONFERENCE AND EXHIBITION, PROCEEDINGS, 1998, : 117 - 121
- [8] On the design and construction of Maysville Cable-Stayed Bridge [J]. 15TH ANNUAL INTERNATIONAL BRIDGE CONFERENCE AND EXHIBITION, 1998, : 117 - 121
- [9] Construction of the My Thuan Cable-Stayed Bridge [J]. Concrete International, 2002, 24 (02) : 49 - 55
- [10] A Research to Cable Force Optimizing Calculation of Cable-stayed Arch Bridge [J]. SECOND SREE CONFERENCE ON ENGINEERING MODELLING AND SIMULATION (CEMS 2012), 2012, 37 : 155 - 160