Construction verification of a cable-stayed arch cooperative bridge in China

被引:1
|
作者
Zhang, Kexin [1 ]
Li, Dachao [1 ]
Liu, He [1 ]
Xue, Xingwei [1 ]
Teng, Fei [1 ]
机构
[1] Shenyang Jianzhu Univ, Sch Transportat & Geomatics Engn, Shenyang, Liaoning, Peoples R China
关键词
bridges; cables & tendons; composite structures; testing & evaluation;
D O I
10.1680/jstbu.22.00029
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The mechanical properties of cooperative system bridges are complex. This paper describes the construction monitoring and load tests of a cable-stayed and arch cooperative bridge. The cable force, girder stress and arch alignment were monitored during construction to ensure the safety of the bridge structure and attain the intended internal force state in the completed bridge. Static and dynamic load tests were performed after completing the bridge to test its bearing capacity. The construction monitoring observations indicated that the cable force and suspender force change of the bridge during construction were generally consistent with theoretical calculations. The measured cable force of cable C01 was between 2155 and 3085 kN, and the measured value of suspender LS15 was between 980 and 1250 kN; these values conform to the laws of mechanics. The load test results demonstrated that the maximum deflection of the mid-span section of the girder was 5.8 mm, which was less than the theoretical value (6.3 mm). The measured impact coefficients of the bridge under four sets of working conditions based on dynamic load testing were similar to the computed results. These results confirm that the girder has sufficient structural stiffness.
引用
收藏
页码:371 / 384
页数:14
相关论文
共 50 条
  • [1] Design and construction of a launched cable-stayed bridge in China
    Wang, Yingliang
    Dai, Xiaochun
    He, Tingguo
    Dai, Jianbing
    Zhang, Jiachun
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 2019, 172 (05) : 3 - 8
  • [2] Analysis of static performance of cable-stayed arch cooperative bridge without back cable
    Zheng, Xilong
    Cui, Yujun
    [J]. ARCHIVES OF CIVIL ENGINEERING, 2022, 68 (02) : 531 - 548
  • [3] Construction of the hybrid cable-stayed bridge
    Kim, D. G.
    Kwon, H. C.
    Lee, K. J.
    [J]. BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE-CYCLE OPTIMIZATION, 2010, : 3328 - 3333
  • [4] DYNAMIC BEHAVIOR OF CABLE-STAYED BRIDGE IN THE WAKE OF AN ARCH BRIDGE
    GRILLAUD, G
    CHAUVIN, A
    BIETRY, J
    [J]. JOURNAL OF WIND ENGINEERING AND INDUSTRIAL AERODYNAMICS, 1992, 42 (1-3) : 1181 - 1189
  • [5] Analysis on Vertical Swivel Construction of Cable-Stayed Bridge with Steel Arch Pylon
    Li, Qionghui
    Wang, Xiangyang
    Han, Lili
    [J]. APPLIED MECHANICS AND MATERIALS II, PTS 1 AND 2, 2014, 477-478 : 635 - 639
  • [6] Research on Development of Arch Tower Cable-Stayed Bridge
    Cao, Yishan
    [J]. SUSTAINABLE CITIES DEVELOPMENT AND ENVIRONMENT PROTECTION, PTS 1-3, 2013, 361-363 : 1245 - 1250
  • [7] On the design and construction of Maysville Cable-Stayed Bridge
    Tang, FF
    Hansen, JM
    [J]. 15TH ANNUAL INTERNATIONAL BRIDGE CONFERENCE AND EXHIBITION, PROCEEDINGS, 1998, : 117 - 121
  • [8] On the design and construction of Maysville Cable-Stayed Bridge
    Tang, FF
    Hansen, JM
    [J]. 15TH ANNUAL INTERNATIONAL BRIDGE CONFERENCE AND EXHIBITION, 1998, : 117 - 121
  • [9] Construction of the My Thuan Cable-Stayed Bridge
    Tang, Man-Chung
    Tao, Jian Ren
    Jang, Dennis J.
    [J]. Concrete International, 2002, 24 (02) : 49 - 55
  • [10] A Research to Cable Force Optimizing Calculation of Cable-stayed Arch Bridge
    Dai Yu-wen
    Wang You-yuan
    [J]. SECOND SREE CONFERENCE ON ENGINEERING MODELLING AND SIMULATION (CEMS 2012), 2012, 37 : 155 - 160