共 50 条
- [1] A Research to Cable Force Optimizing Calculation of Cable-stayed Arch Bridge [J]. SECOND SREE CONFERENCE ON ENGINEERING MODELLING AND SIMULATION (CEMS 2012), 2012, 37 : 155 - 160
- [3] Vibration research of cable-stayed bridge with tower-girder consolidation [J]. Ping, Chen, 1600, Transport and Telecommunication Institute, Lomonosova street 1, Riga, LV-1019, Latvia (18):
- [5] Bridge Deck Transverse Stress Analysis of Arch Tower Cable-Stayed Bridge With Steel Box Girder [J]. SUSTAINABLE CITIES DEVELOPMENT AND ENVIRONMENT PROTECTION, PTS 1-3, 2013, 361-363 : 1240 - 1244
- [6] Dynamical analysis of a cable-stayed bridge with one tower [J]. ADVANCES IN CIVIL AND STRUCTURAL ENGINEERING III, PTS 1-4, 2014, 501-504 : 1292 - +
- [8] Research on Structure design of Cable-stayed Bridge [J]. SUSTAINABLE ENVIRONMENT AND TRANSPORTATION, PTS 1-4, 2012, 178-181 : 2565 - 2569
- [10] Model test of composite joint for tower of cable-stayed bridge [J]. Liu, Yuqing (yql@tongji.edu.cn), 1600, Harbin Institute of Technology (49):