摘要
One of the main problems related to mining investment decisions is the use of accurate prediction models. Metallurgical recovery is a major source of variability, and in this regard, the Chuquicamata processing plant recovery was modelled as a function of geomining-metallurgical data and ore characteristics obtained from a historical database. In particular, the data-set gathered contains information related to feed grades, ore hardness, particle size, mineralogy, pH, and flotation reagents. A systemic approach was applied to fit a multivariate regression model representing the copper recovery in the plant. The systemic approach consists of an initial projection of the characteristic grinding product size (P-80), based upon energy consumption at the particle size reduction step, followed by a flotation recovery model. The model allows for an improvement in the investment decision process by predicting performance and risk. The final geometallurgical model uses eight operational variables and is a significant improvement over conventional prediction models. A validation was performed using a recent data-set, and this showed a high correlation coefficient with a low mean absolute error, which reveals that the geometallurgical model is able to predict, with acceptable accuracy, the actual copper recovery in the plant.
引用
收藏
页码:549 / 556
页数:8
相关论文
共 50 条
  • [31] LONG-TERM PLANNING IN USSR
    KOTOV, F
    LONG RANGE PLANNING, 1975, 8 (04) : 61 - 63
  • [32] Long-Term Program Planning
    Quinsey, D. L.
    JOURNAL OF HIGHER EDUCATION, 1942, 13 (08): : 420 - 422
  • [33] SCENARIOS IN LONG-TERM PLANNING
    JULIEN, PA
    LAMONDE, P
    LATOUCHE, D
    ACTUALITE ECONOMIQUE, 1975, 51 (02): : 253 - 281
  • [34] PLANNING IN LONG-TERM AREAS
    CHADAEV, Y
    KOMMUNIST, 1963, (14): : 70 - 78
  • [35] ON LONG-TERM PLANNING IN HUNGARY
    HOCH, R
    ACTA OECONOMICA, 1980, 24 (1-2) : 21 - 45
  • [36] Revegetation of Copper Mine Tailings Through Land Application of Biosolids: Long-Term Monitoring
    Pepper, Ian L.
    Zerzghi, Huruy G.
    Bengson, Stuart A.
    Glenn, Ed P.
    ARID LAND RESEARCH AND MANAGEMENT, 2013, 27 (03) : 245 - 256
  • [37] Long-term stability of a biofilter treating dimethyl sulphide
    Smet, E
    VanLangehove, H
    Verstraete, W
    APPLIED MICROBIOLOGY AND BIOTECHNOLOGY, 1996, 46 (02) : 191 - 196
  • [38] An optimization model for the long-term planning of energy distribution networks
    Somoza, Ana
    Pozo, Carlos
    de la Hoz, Jordi
    Guillen-Gosalbez, Gonzalo
    Espuna, Antonio
    Graells, Moises
    2016 IEEE INTERNATIONAL ENERGY CONFERENCE (ENERGYCON), 2016,
  • [39] VON NEUMANNS MODEL AND SOVIET LONG-TERM (PERSPECTIVE) PLANNING
    MORTON, G
    ZAUBERMAN, A
    KYKLOS, 1969, 22 (01) : 45 - 61
  • [40] LONG-TERM PLANNING MODEL FOR OPTIMAL MILK PRODUCTION.
    Amir, Ilan
    Sharar, Shalom
    Bar-Chaim, Jacob
    Transactions of the American Society of Agricultural Engineers, 1980, 23 (06): : 1515 - 1520