Solving the single machine scheduling problem with general job-dependent past-sequence-dependent setup times and learning effects

被引:20
|
作者
Soroush, H. M. [1 ]
机构
[1] Kuwait Univ, Coll Sci, Dept Stat & Operat Res, Safat 13060, Kuwait
关键词
scheduling; single machine; setup times; learning effect; job-dependent; branch and bound; MINIMIZE; COMMON;
D O I
10.1504/EJIE.2012.048857
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper deals with a single machine scheduling problem with general past-sequence-dependent (psd) setup time and log-linear learning in which the setup times and learning effects are job-dependent. The setup times are unique functions of the length of already processed jobs, and the learning effects show that processing times are unique decreasing functions of job positions. The goal is to find the optimal sequences that minimise objective functions such as the makespan, total completion time, total lateness, total waiting cost, total waiting time, total absolute differences in completion times, and the sum of earliness, tardiness and common due date penalty. Special cases of the resulting problems are solvable in polynomial time; however, the general problems are difficult to solve. We propose branch-and-bound (B&B) methods to derive the optimal sequences for such problems. Computational results show that the proposed methods can solve relatively large problem instances in reasonable amounts of time. [Received 21 December 2010; Revised 25 February 2011; Accepted 8 April 2011]
引用
收藏
页码:596 / 628
页数:33
相关论文
共 50 条
  • [21] Deteriorating jobs and learning effects on a single-machine scheduling with past-sequence-dependent setup times
    Yin, Na
    Wang, Ji-Bo
    Wang, Dan
    Wang, Li-Yan
    Wang, Xiao-Yuan
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 46 (5-8): : 707 - 714
  • [22] Some single-machine scheduling problems with past-sequence-dependent setup times and a general learning effect
    Yin, Yunqiang
    Xu, Dehua
    Wang, Jiayin
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 48 (9-12): : 1123 - 1132
  • [23] Single machine scheduling with general time-dependent deterioration, position-dependent learning and past-sequence-dependent setup times
    Xue Huang
    Gang Li
    Yunzhang Huo
    Ping Ji
    Optimization Letters, 2013, 7 : 1793 - 1804
  • [24] Some single-machine scheduling problems with past-sequence-dependent setup times and a general learning effect
    Yunqiang Yin
    Dehua Xu
    Jiayin Wang
    The International Journal of Advanced Manufacturing Technology, 2010, 48 : 1123 - 1132
  • [25] A PARAMETRIC ANALYSIS FOR SINGLE MACHINE SCHEDULING WITH PAST-SEQUENCE-DEPENDENT SETUP TIMES
    Mani, V.
    Chang, Pei-Chann
    Chen, Shih Hsin
    INTERNATIONAL JOURNAL OF INNOVATIVE COMPUTING INFORMATION AND CONTROL, 2010, 6 (3A): : 1113 - 1121
  • [26] Single-machine scheduling problems with past-sequence-dependent setup times
    Koulamas, Christos
    Kyparisis, George J.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) : 1045 - 1049
  • [27] Bi-Criterion Single Machine Scheduling Problem with a Past-Sequence-Dependent Setup Times and Learning Effect
    Chen, S. H.
    Mani, V.
    Chen, Y. H.
    2015 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2015, : 185 - 189
  • [28] A parametric analysis for single machine scheduling with past-sequence-dependent setup times
    Mani, V.
    Chang, Pei-Chann
    Chen, Shih Hsin
    International Journal of Innovative Computing, Information and Control, 2010, 6 (03): : 1113 - 1121
  • [29] Single machine scheduling with past-sequence-dependent setup times and deteriorating jobs
    Zhao, Chuanli
    Tang, Hengyong
    COMPUTERS & INDUSTRIAL ENGINEERING, 2010, 59 (04) : 663 - 666
  • [30] Single machine scheduling with exponential time-dependent learning effect and past-sequence-dependent setup times
    Wang, Ji-Bo
    Wang, Dan
    Wang, Li-Yan
    Lin, Lin
    Yin, Na
    Wang, Wei-Wei
    COMPUTERS & MATHEMATICS WITH APPLICATIONS, 2009, 57 (01) : 9 - 16