Production Scheduling and Capacity Utilization in Terms of Mass Customized Manufacturing

被引:1
|
作者
Modrak, Vladimir [1 ]
Soltysova, Zuzana [1 ]
Semanco, Pavol [2 ]
Sudhakara, Pandian R. [3 ]
机构
[1] Tech Univ Kosice, Fac Mfg Technol, Kosice, Slovakia
[2] Lear Corp, Presov, Slovakia
[3] SACS MAVMM Engn Coll, Madurai, Tamil Nadu, India
关键词
Production scheduling; Capacity utilization; Batch size; Mass customization; ASSEMBLY LINES;
D O I
10.1007/978-3-030-18789-7_25
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
As well-known good planning is a prerequisite to scheduling. This paper outlines methodology framework to optimize schedules in order to employ earliest due date criterion that plays crucial role in mass customization environment. For this purpose, the new concept for production scheduling is described by using proprietary software. In the second part of the paper, the proposed methodology framework was applied and explained on the theoretical example. Enumeration and analysis of the selected production indicators are also provided in this part. The last section of the paper summarizes useful findings.
引用
收藏
页码:295 / 306
页数:12
相关论文
共 50 条
  • [41] Distributed production scheduling in an open manufacturing environment
    Lou, Ping
    Liu, Quan
    Zhou, Zude
    Quan, ShuHai
    [J]. ICIEA 2008: 3RD IEEE CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS, PROCEEDINGS, VOLS 1-3, 2008, : 1610 - +
  • [42] Framework and Algorithm of Customized Workshop Production-logistics Collaborative Scheduling
    Cai, Lei
    Li, Wenfeng
    Luo, Yun
    [J]. Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2022, 58 (07): : 214 - 226
  • [43] Scheduling flexible manufacturing systems for apparel production
    Tomastik, RN
    Luh, PB
    Liu, GD
    [J]. IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1996, 12 (05): : 789 - 799
  • [44] PRODUCTION SCHEDULING IN A FLEXIBLE MANUFACTURING SYSTEM WITH SETUPS
    GHOSH, S
    GAIMON, C
    [J]. IIE TRANSACTIONS, 1993, 25 (05) : 21 - 35
  • [45] Manufacturing Chain and it's production scheduling problem
    Wang, Yanhong
    Wu, Xin
    Yu, Yang
    Li, Weimin
    [J]. 2007 IEEE INTERNATIONAL CONFERENCE ON CONTROL AND AUTOMATION, VOLS 1-7, 2007, : 2023 - +
  • [46] Production plan scheduling on SMT manufacturing lines
    Farkas, G. A.
    Martinek, P.
    [J]. 2017 IEEE 23RD INTERNATIONAL SYMPOSIUM FOR DESIGN AND TECHNOLOGY IN ELECTRONIC PACKAGING (SIITME), 2017, : 102 - +
  • [47] Formulating Scheduling Problem for a Manufacturing Production System
    Shen, Z.
    Burnham, K. J.
    Smalov, L.
    Amin, S.
    [J]. INTERNATIONAL CONFERENCE ON COMPUTER, NETWORK SECURITY AND COMMUNICATION ENGINEERING (CNSCE 2014), 2014, : 683 - 687
  • [48] Additive manufacturing for customized hearing aid parts production: an empirical study
    Sabarish, S.
    Udhayakumar, P.
    Pandiyarajan, R.
    [J]. JOURNAL OF THE CHINESE INSTITUTE OF ENGINEERS, 2021, 44 (07) : 704 - 717
  • [49] A simulation study of capacity utilization to predict future capacity for manufacturing system sustainability
    Sen Rimo, Tan Hauw
    Tine, Ong Chai
    [J]. INTERNATIONAL CONFERENCE ON ECO ENGINEERING DEVELOPMENT 2017 (ICEED 2017), 2018, 109
  • [50] PRODUCTION AS A SERVICE: OPTIMIZING UTILIZATION IN MANUFACTURING SYSTEMS
    Porter, Matthew
    Raghavan, Vikram
    Lin, Yikai
    Mao, Z. Morley
    Barton, Kira
    Tilbury, Dawn
    [J]. PROCEEDINGS OF THE ASME 9TH ANNUAL DYNAMIC SYSTEMS AND CONTROL CONFERENCE, 2016, VOL 2, 2017,