Modeling of material handling hoist operations in a PCB manufacturing facility

被引:5
|
作者
Mak, RWT
Gupta, SM
Lam , K
机构
[1] Northeastern Univ, Dept Mech Ind & Mfg Engn, Lab Responsible Mfg, Boston, MA 02115 USA
[2] Asia Pacific Headquarters, Planning & engn Customer Serv, Hong Kong, Hong Kong, Peoples R China
[3] City Univ Hong Kong, Div Commerce, Kowloon, Hong Kong, Peoples R China
来源
JOURNAL OF ELECTRONICS MANUFACTURING | 2002年 / 11卷 / 01期
关键词
hoist scheduling; discrete event simulation; PCB manufacturing; material handling; electroplating;
D O I
10.1142/S0960313102000229
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper outlines a framework for flexible hoist scheduling that utilizes a knowledge-based simulation system to emulate multi-hoist operations in an electroplating line and derives hoist schedule to meet production demands. The selected hoist schedule is then used by the knowledge-based controller to control the material handling hoist operations in real-time. The paper describes the overall design of the knowledge-based simulator for material handling hoist operations that forms the fundamental part of the proposed framework. Most hoist schedules in industry are experimented on-line, which are costly and time consuming. The use of knowledge-based simulation will save both cost and time. The simulator aims at improving current manual approaches so that better schedules can be identified. We demonstrate the application of the simulator to bi-directional multi-hoist line configuration that is commonly found in industry today, where loading and unloading stations are on the same end of the line, and consider other more realistic system parameters than those considered in previous studies. Three new hoist scheduling heuristics axe proposed and their performances are compared with four previously studied rules. To this end, we also study the effect of several system variables such as hoist speed and inter-hoist distance on productivity. The simulation models developed are based on data from actual multi-hoist electroplating lines within several PCB manufacturing facilities.
引用
收藏
页码:33 / 50
页数:18
相关论文
共 50 条
  • [1] A practical algorithm for cyclic hoist scheduling in a PCB manufacturing facility
    Mak, RWT
    Lam, KK
    Gupta, SR
    [J]. JOURNAL OF ELECTRONICS MANUFACTURING, 1998, 8 (3-4): : 193 - 207
  • [2] PLANNING A MANUFACTURING FACILITY FOR MATERIAL HANDLING
    KULWIEC, R
    [J]. PLANT ENGINEERING, 1977, 31 (15) : 108 - 119
  • [3] HOIST SCHEDULING FOR A PCB ELECTROPLATING FACILITY
    SHAPIRO, GW
    NUTTLE, HLW
    [J]. IIE TRANSACTIONS, 1988, 20 (02) : 157 - 167
  • [4] MATERIAL HANDLING CONSIDERATIONS IN A FLEXIBLE PCB MANUFACTURING ENVIRONMENT
    SAUNDERS, G
    [J]. PROCEEDING OF THE TECHNICAL PROGRAM OF NEPCON WEST 89, VOLS 1 AND 2, 1989, : 1929 - 1940
  • [5] Managing lean manufacturing in material handling operations
    Green, James C.
    Lee, Jim
    Kozman, Theodore A.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (10) : 2975 - 2993
  • [6] Optimal cyclic scheduling of a material handling hoist in an automated PCB electroplating line (ID: 3-078)
    Che Ada
    Chu Chengbin
    Yan Pengyu
    [J]. PROCEEDINGS OF THE 13TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-5: INDUSTRIAL ENGINEERING AND MANAGEMENT INNOVATION IN NEW-ERA, 2006, : 1369 - 1373
  • [7] The influence of material handling operations on the schedule makespan in manufacturing cell environments
    Babiceanu, RF
    Chen, FF
    Sturges, RH
    [J]. Transactions of the North American Manufacturing Research Institution of SME 2005, Vol 33, 2005, 2005, 33 : 195 - 202
  • [8] Defect reduction in PCB contract manufacturing operations
    Santos, DL
    Raj, RB
    Lane, M
    Sissenstein, D
    Testani, M
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 33 (1-2) : 381 - 384
  • [9] Real-time holonic scheduling of material handling operations in a dynamic manufacturing environment
    Babiceanu, RF
    Chen, FF
    Sturges, RH
    [J]. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2005, 21 (4-5) : 328 - 337
  • [10] Single hoist cyclic scheduling with multiple tanks: a material handling solution
    Zhou, ZL
    Li, L
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2003, 30 (06) : 811 - 819