共 50 条
- [1] A practical algorithm for cyclic hoist scheduling in a PCB manufacturing facility [J]. JOURNAL OF ELECTRONICS MANUFACTURING, 1998, 8 (3-4): : 193 - 207
- [2] PLANNING A MANUFACTURING FACILITY FOR MATERIAL HANDLING [J]. PLANT ENGINEERING, 1977, 31 (15) : 108 - 119
- [3] HOIST SCHEDULING FOR A PCB ELECTROPLATING FACILITY [J]. IIE TRANSACTIONS, 1988, 20 (02) : 157 - 167
- [4] MATERIAL HANDLING CONSIDERATIONS IN A FLEXIBLE PCB MANUFACTURING ENVIRONMENT [J]. PROCEEDING OF THE TECHNICAL PROGRAM OF NEPCON WEST 89, VOLS 1 AND 2, 1989, : 1929 - 1940
- [6] Optimal cyclic scheduling of a material handling hoist in an automated PCB electroplating line (ID: 3-078) [J]. PROCEEDINGS OF THE 13TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-5: INDUSTRIAL ENGINEERING AND MANAGEMENT INNOVATION IN NEW-ERA, 2006, : 1369 - 1373
- [7] The influence of material handling operations on the schedule makespan in manufacturing cell environments [J]. Transactions of the North American Manufacturing Research Institution of SME 2005, Vol 33, 2005, 2005, 33 : 195 - 202