The influence of material handling operations on the schedule makespan in manufacturing cell environments

被引:0
|
作者
Babiceanu, RF [1 ]
Chen, FF [1 ]
Sturges, RH [1 ]
机构
[1] Virginia Polytech Inst & State Univ, Ctr High Performance Mfg, Grado Dept Ind & Syst Engn, Blacksburg, VA 24061 USA
关键词
material handling operations; lower bounds; schedule critical paths;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In manufacturing environments, material handling is one of the processes that needs to be performed in order to move materials and products from one machine to another. The complexity associated with manufacturing scheduling problems, including material handling scheduling, has been intensively studied in the last several decades, so now it is widely accepted that most practical real-world scheduling problems cannot be solved optimally in reasonable time due to the combinatorial explosiveness associated with most of them. This paper considers the influence of material handling operations on the schedule makespan in manufacturing scheduling environments. Four types of lower bounds on the schedule makespan and potential delays introduced into the schedule when considering material handling operations are described. Evaluating the results obtained by calculating lower bounds and taking in consideration the potential delays can lead to improved solutions and a better utilization of the resources.
引用
收藏
页码:195 / 202
页数:8
相关论文
共 50 条
  • [1] Managing lean manufacturing in material handling operations
    Green, James C.
    Lee, Jim
    Kozman, Theodore A.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (10) : 2975 - 2993
  • [2] Modeling of material handling hoist operations in a PCB manufacturing facility
    Mak, RWT
    Gupta, SM
    Lam , K
    [J]. JOURNAL OF ELECTRONICS MANUFACTURING, 2002, 11 (01): : 33 - 50
  • [3] Schedule evaluation in unstable manufacturing environments
    de Haro, Santiago Lopez
    Gershwin, Stanley B.
    Rosenfield, Donald B.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 121 (01) : 183 - 194
  • [4] A model based expert system for handling of operations in a manufacturing cell with a robot
    Usta, Yusuf
    [J]. Journal of the Faculty of Engineering and Architecture of Gazi University, 2005, 20 (02): : 275 - 288
  • [5] Energy conscious scheduling of a material handling robot in a manufacturing cell
    Gurel, Sinan
    Gultekin, Hakan
    Akhlaghi, Vahid Eghbal
    [J]. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2019, 58 : 97 - 108
  • [6] Real-time holonic scheduling of material handling operations in a dynamic manufacturing environment
    Babiceanu, RF
    Chen, FF
    Sturges, RH
    [J]. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2005, 21 (4-5) : 328 - 337
  • [7] A dynamic scheduling approach for optimizing the material handling operations in a robotic cell
    Yan, Pengyu
    Liu, Shi Qiang
    Sun, Tengfei
    Ma, Kaiyuan
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2018, 99 : 166 - 177
  • [8] An operations planner for integrated shop floor material processing and material handling operations
    Steele, J
    Cannon, D
    Wysk, R
    [J]. 2001 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, VOLS I-IV, PROCEEDINGS, 2001, : 3133 - 3138
  • [9] GE BUILDS A FLEXIBLE MANUFACTURING CELL AROUND COMPUTERIZED MATERIAL HANDLING
    RHEA, N
    [J]. MATERIAL HANDLING ENGINEERING, 1983, 38 (06): : 50 - 53
  • [10] The use of memetic algorithm in operations scheduling of cellular manufacturing systems with makespan
    Tavakkoli-Moghaddam, R.
    Bozorgzad, A. A.
    Gholipour-Kanani, Y.
    [J]. 2007 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2007, : 1120 - +