A Mathematical Model for Double Layer Precast Production Scheduling

被引:0
|
作者
Iamsumang, Nuntiya [1 ]
Tharmmaphornphilas, Wipawee [1 ]
机构
[1] Chulalongkorn Univ, Dept Ind Engn, Bangkok, Thailand
关键词
Formula selection; double layer; precast; scheduling; MIP; DEPENDENT PROCESSING TIMES; MACHINE; CONSTRAINTS;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper involves a precast production with double layer in identical parallel molds. The precast production consists of 5 processes to be produced sequentially. Each process requires a specific resource that must be shared among molds except the curing process which does not require any resources. There are 5 concrete formulas for considering that do not effect on the precast quality. Nevertheless, each formula results in different costs and different processing time. The more expensive formula requires the shorter processing time. We propose an MIP model to select formulas and schedule all jobs to finish within due date.
引用
收藏
页码:85 / 89
页数:5
相关论文
共 50 条
  • [1] Flowshop scheduling model for bespoke precast concrete production planning
    Benjaoran, Vacharapoom
    Dawood, Nashwan
    Hobbs, Brian
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2005, 23 (01) : 93 - 105
  • [2] MATHEMATICAL MODEL FOR MACHINE SCHEDULING OF SERIES PRODUCTION
    AZEMA, M
    [J]. REVUE FRANCAISE D AUTOMATIQUE INFORMATIQUE RECHERCHE OPERATIONNELLE, 1970, 4 (NV2): : 17 - 28
  • [3] Production scheduling for precast plants using a flow shop sequencing model
    Chan, WT
    Hu, H
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2002, 16 (03) : 165 - 174
  • [4] Precast production scheduling with genetic algorithms
    Chan, WT
    Hu, H
    [J]. PROCEEDINGS OF THE 2000 CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1 AND 2, 2000, : 1087 - 1094
  • [5] Mathematical model for scheduling food production in hospital catering
    Abderrabi, F.
    Godichaud, M.
    Yalaoui, A.
    Yalaoui, F.
    Amodeo, L.
    Qerimi, A.
    Thivet, E.
    [J]. IFAC PAPERSONLINE, 2020, 53 (02): : 10670 - 10675
  • [6] Improved Precast Production-Scheduling Model Considering the Whole Supply Chain
    Wang, Zhaojing
    Hu, Hao
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2017, 31 (04)
  • [7] Formula selection and scheduling for precast concrete production
    Tharmmaphornphilas, Wipawee
    Sareinpithak, Nattapon
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (17) : 5195 - 5209
  • [8] An application of genetic algorithms to precast production scheduling
    Chan, WT
    Hu, H
    [J]. COMPUTERS & STRUCTURES, 2001, 79 (17) : 1605 - 1616
  • [9] Optimized flowshop scheduling of multiple production lines for precast production
    Yang, Zhitian
    Ma, Zhiliang
    Wu, Song
    [J]. AUTOMATION IN CONSTRUCTION, 2016, 72 : 321 - 329
  • [10] A novel mathematical model for Integration of Production Planning and Maintenance Scheduling
    Rastgar, I.
    Rezaeian, J.
    Mahdavi, I.
    Fattahi, P.
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT, 2023, 14 (02): : 122 - 137