Advanced seismic investigations during construction of hydro tunnels

被引:0
|
作者
Dickmann, Thomas [1 ]
Hecht-Mendez, J.
Choudhary, Kripal [2 ]
Rahbar, Ataollah [3 ]
机构
[1] Amberg Technol AG, Regensdorf, Switzerland
[2] Amberg Engn AG, Gurgaon, India
[3] Farab Co, Colombo, Sri Lanka
关键词
Tunnel Seismic Prediction; Rock Characterisation; Geological Forecast;
D O I
暂无
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
In order to maintain the economic and safety demand in underground projects for hydropower there is a vital necessity of advance geological prediction by using the seismic reflection prediction technique. Tunnelling in many projects suffered due to uncertain or even unknown geological problems such as fault and shear zones, cavities and ingress of water and high level of seismicity etc. By recording the full wave-field of reflected signals, P-and S-waves, prediction of the rock mass quality in term of physical and mechanical parameters up to 150 m ahead of the face is possible. Moreover, 3D velocity distribution images are generated by means of seismic modelling. Results of surveys performed at the Uma Oya Multipurpose Development Project in Sri Lanka using this technology are discussed. Here, the headrace tunnel of 15 km length is under construction using a shield TBM. Although installing pre-cast segments behind the cutter head, seismic investigation become still manageable and provide an important impact on logistic optimization that could end up in an economic and consequentially time-and cost-effective practice of prediction ahead.
引用
收藏
页码:149 / 157
页数:9
相关论文
共 50 条
  • [1] MINI-SEISMIC INVESTIGATIONS IN TUNNELS - METHODOLOGY AND RESULTS
    BRIZZOLARI, E
    [J]. GEOEXPLORATION, 1981, 18 (04): : 259 - 267
  • [2] MINI-SEISMIC INVESTIGATIONS IN TUNNELS - METHODOLOGY AND RESULTS
    BRIZZOLARI, E
    [J]. GEOPHYSICAL PROSPECTING, 1979, 27 (03) : 690 - 691
  • [3] PROBLEMS OF ENSURING SEISMIC SAFETY IN THE CONSTRUCTION OF TRANSPORT TUNNELS
    Kholodilov, A. N.
    Gendler, S. G.
    Vinogradova, E. Yu.
    Shilyaev, A.
    [J]. JOURNAL OF MINING INSTITUTE, 2007, 171 : 229 - 232
  • [4] Seismic calculation of tunnels using advanced numerical models
    Salvador Martínez, Eduardo
    [J]. Revista de Obras Publicas, 2020, 167 (3624): : 26 - 35
  • [5] INVESTIGATION OF THE EFFICIENCY OF THE CUT-OFF SLOT FOR REDUCING THE SEISMIC EFFECT DURING THE CONSTRUCTION OF TUNNELS
    Dernov, D. A.
    [J]. JOURNAL OF MINING INSTITUTE, 2006, 167 (01): : 7 - 9
  • [6] Shaking table investigations on seismic performance of prefabricated corrugated steel utility tunnels
    Yue, Feng
    Liu, Bowen
    Zhu, Bin
    Jiang, Xiaoli
    Chen, Shouyi
    Jaisee, Sujit
    Chen, Le
    Lv, Binchi
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2020, 105
  • [7] Seismic damage mechanism and treatment technologies of construction landslide section of highway tunnels in highly seismic region
    Wang, Dao-Yuan
    Cui, Guang-Yao
    Yuan, Jin-Xiu
    Zhu, Chang-An
    [J]. Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2018, 40 (02): : 353 - 359
  • [8] Characterization of the Visible Light Communications during the Construction of Tunnels
    Morales Cespedes, Maximo
    Garcia Armada, Ana
    [J]. 2019 16TH INTERNATIONAL SYMPOSIUM ON WIRELESS COMMUNICATION SYSTEMS (ISWCS), 2019, : 356 - 360
  • [9] Convergence and Settlement Monitoring During Construction of Metro Tunnels
    Liu Shaotang
    Ji Zhigang
    Liang Yubao
    Fan Wenping
    Liao Zhongping
    [J]. ACUUS2009: PROCEEDINGS OF 12TH INTERNATIONAL CONFERENCE OF THE ASSOCIATED RESEARCH CENTERS FOR URBAN UNDERGROUND SPACE, 2009, : 464 - 469
  • [10] Effect of stress disturbance induced by construction on the seismic response of shallow bored tunnels
    Gomes, Rui Carrilho
    [J]. COMPUTERS AND GEOTECHNICS, 2013, 49 : 338 - 351