Research on Geosynthetics in Tailings Dam Reinforcement

被引:5
|
作者
Shen, Louyan [1 ,5 ]
Zhou, Keping [1 ]
Wei, Zuoan [2 ,3 ]
Chen, Yulong [3 ,4 ]
机构
[1] Cent South Univ Technol, Sch Resources & Safety Engn, Changsha 410083, Peoples R China
[2] Chongqing Univ, State Key Lab Coal Mine Disaster Dynam & Control, Chongqing 400044, Peoples R China
[3] Chongqing Univ, Coll Resources & Environm Sci, Chongqing 400044, Peoples R China
[4] Chongqing Univ, State & Local Joint Engn Lab Methane Drainage, Complex Coal Gas Seam, Chongqing 400044, Peoples R China
[5] China Nerlin Engn Co Ltd, Nanchang 330002, Jiangxi, Peoples R China
基金
中国国家自然科学基金;
关键词
geosynthetics; tailings dam; stability analysis; numerical simulation; HORIZONTAL SLICE METHOD;
D O I
10.4028/www.scientific.net/AMR.402.675
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
With the tailings dam reinforcement project newly built in Yakou as the example and limit equilibrium horizontal slice method as the methodology, this paper has researched the feasibility of applying geosynthetics in fine tailings dam reinforcement. The results from limit equilibrium horizontal slice method show that the stability of reinforced tailings dam with geosynthetics increases by 14 similar to 17%; while results from numerical simulation method show that the principal stress vector direction and the principal displacement vector direction of the dam body can be changed to be favorable to the stabilization of dam by using geosynthetics to reinforce the tailings dam.
引用
收藏
页码:675 / +
页数:3
相关论文
共 50 条
  • [31] Tailings dam remedial works
    Clements, E.W.F.
    Penman, A.D.M.
    Proceedings of the Institution of Civil Engineers (London). Part 1 - Design & Construction, 1988, 84 pt 1 : 1261 - 1265
  • [32] Remediation of the Sillamae tailings dam
    Jakubick, AT
    Oswald, KD
    Talviste, P
    Valdstad, T
    BALTIC GEOTECHNICS IX 2000, PROCEEDINGS, 2000, : 204 - 220
  • [33] Electroosmosis of gold tailings under multiple electrokinetic geosynthetics electrodes
    Du, Changbo
    Niu, Ben
    Yi, Fu
    Wang, Meng
    Jiang, Xinqi
    GEOTEXTILES AND GEOMEMBRANES, 2024, 52 (04) : 585 - 597
  • [34] Current research on geosynthetics
    Christopher, Barry R.
    Holtz, Robert D. Jr.
    Geotechnical News, 1992, 10 (03):
  • [35] Research, Development and Application of Surface Displacement Automatic Monitoring System of Tailings dam
    Ouyan, Zhenhua
    EQUIPMENT MANUFACTURING TECHNOLOGY, 2012, 422 : 304 - 309
  • [36] Research on the movement mechanism of pulp surging from tailings dam-break
    Jing, Xiaofei
    ELECTRICAL POWER & ENERGY SYSTEMS, PTS 1 AND 2, 2012, 516-517 : 997 - 1000
  • [37] Research on vibrating string transducer used in online monitoring system of tailings dam
    Wang, Ligang
    Zhang, Yuansheng
    Zhang, Da
    2017 4TH INTERNATIONAL CONFERENCE ON INFORMATION SCIENCE AND CONTROL ENGINEERING (ICISCE), 2017, : 1690 - 1693
  • [38] Research on reinforcement measure of embankment cracks of Xiaowan arch dam
    Zhang, Xiong
    Wang, Weiming
    Chen, Shenghong
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2011, 30 (04): : 657 - 665
  • [40] Triaxial Testing of Geosynthetics Reinforced Tailings with Different Reinforced Layers
    Yi, Fu
    Du, Changbo
    MATERIALS, 2020, 13 (08)