Study on Cost Forecast Method of Power Projects Based on Data Mining Technology

被引:0
|
作者
Peng Guangjin [1 ]
Yu Jihui [1 ]
Wei Juntao [1 ]
Zhu Hui [2 ]
Bo Chun [2 ]
机构
[1] Chongqing Univ, State Key Lab Power Transmiss Equipment & Syst Se, Chongqing 630044, Peoples R China
[2] Chongqing Power Co, Power Tech Econ Center, Chongqing 630044, Peoples R China
关键词
Date mining; Clustering analysis; Support vector machine; Power projecst; budgetary estimation; forecast method;
D O I
暂无
中图分类号
TN [电子技术、通信技术];
学科分类号
0809 ;
摘要
Based on cost data of certain zone history power transmission line projects, applying data mining technology including relative analysis, clustering analysis and support vector machine theory, one kind of new cost forecast methods of power projects is presented. Firstly, applying relative analysis and partial correlation analysis in SPSS15.0 software package, cost forecast index system is built after simplifying technical conditions of power projects. Next, using, clustering analysis, noise information of cost data of history projects is deleted. At last, using support vector machine theory, cost forecast model of power projects is designed. Simulation results of real power transmission line projects in Matlab7.0 software package show such model is valid and feasible.
引用
收藏
页码:11241 / +
页数:2
相关论文
共 50 条
  • [31] The Application of Data Warehouse and Data Mining Technology in Power System
    Yi, Zhang
    PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON EDUCATION, MANAGEMENT, COMPUTER AND SOCIETY, 2016, 37 : 1320 - 1323
  • [32] Forecast Based Classification for Power Consumption Data
    Tornai, Kalman
    Olah, Andras
    Lorincz, Mate
    2016 2ND INTERNATIONAL CONFERENCE ON INTELLIGENT GREEN BUILDING AND SMART GRID (IGBSG), 2016, : 197 - 201
  • [33] A Study On Conditions Analysis Of Power Plant Based On Data Mining
    Liu BaoLing
    He Jun
    Liu GuangMing
    2010 2ND INTERNATIONAL ASIA CONFERENCE ON INFORMATICS IN CONTROL, AUTOMATION AND ROBOTICS (CAR 2010), VOL 3, 2010, : 161 - 164
  • [34] Data Mining Based Power System Fault Type Prediction Method
    Wang, Shaorui
    Lu, Tianguang
    Li, Yixiao
    He, Xueqian
    Li, Jing
    2021 IEEE IAS INDUSTRIAL AND COMMERCIAL POWER SYSTEM ASIA (IEEE I&CPS ASIA 2021), 2021, : 1128 - 1132
  • [35] Warranty cost forecast based on car failure data
    Hrycej, Tomas
    Grabert, Matthias
    2007 IEEE INTERNATIONAL JOINT CONFERENCE ON NEURAL NETWORKS, VOLS 1-6, 2007, : 108 - 113
  • [36] Retail Commodity Sale Forecast Model Based on Data Mining
    Zhang, Jing
    Li, Juan
    2016 8TH INTERNATIONAL CONFERENCE ON INTELLIGENT NETWORKING AND COLLABORATIVE SYSTEMS (INCOS), 2016, : 307 - U709
  • [37] Approach to daily load forecast of VSNN based on data mining
    Dong-Xiao, Niu
    Zhi-Hong, Gu
    Mian, Xing
    Hui-Qing, Wang
    ICIEA 2007: 2ND IEEE CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS, VOLS 1-4, PROCEEDINGS, 2007, : 363 - +
  • [38] Analysis and Forecast of Shanghai Financial Revenue Based on Data Mining
    Deng, Wei
    PROCEEDINGS OF THE 8TH INTERNATIONAL CONFERENCE ON MANAGEMENT AND COMPUTER SCIENCE (ICMCS 2018), 2018, 77 : 157 - 161
  • [39] Data Mining Algorithms for Weather Forecast Phenomena : Comparative Study
    Ali, Marwa Farouk M.
    Asklany, Somia A.
    Abd El-wahab, M.
    Hassan, M. A.
    INTERNATIONAL JOURNAL OF COMPUTER SCIENCE AND NETWORK SECURITY, 2019, 19 (09): : 76 - 81
  • [40] Data mining technology and its application on power system
    Liao, Z.
    Sun, Y.
    Dianli Xitong Zidonghue/Automation of Electric Power Systems, 2001, 25 (11): : 62 - 66