Geotechnical aspects of tunnel lining with segmental joint parameters to improve soil surface settlement prediction

被引:0
|
作者
Jusoh, S. N. [1 ]
Yusufiansyah, D. [1 ]
Mohamad, H. [2 ]
Abdullah, R. A. [1 ]
Yunus, N. Z. Mohd [1 ]
机构
[1] Univ Teknol Malaysia, Sch Civil Engn, Dept Geotech & Transportat, Fac Engn, Johor Baharu 81310, Johor, Malaysia
[2] Univ Teknol Petronas, Civil & Environm Engn Dept, Seri Iskandar 81310, Perak, Malaysia
关键词
D O I
10.1088/1755-1315/220/1/012002
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Conventional lining design usually considers tunnel lining as a uniform rigid ring model by implying high partial safety factor on the bending moment which is overestimated, due to inaccurate assumptions. To overcome this problem, investigation on the influence of joints on the behaviour of the global lining is significantly important especially when the interaction between segments is included. This paper presents investigation in tunnel segment joint influence on global tunnel lining behaviour especially when the interaction between segments becomes nonlinear, in different type of soil, so that more realistic soil-tunnel lining response can be obtained. The effect of segment joint parameters (linear or nonlinear) and soil parameters was investigated via numerical modelling. The predicted stress and displacement results from the numerical model were verified with the result obtained from field data collection. FEM model of original soil and settlement monitoring data depicted similar pattern of settlement but the FEM model did not captured the sudden settlement at the distance of 40 m from starting point. This was due to the simplification of FEM model and assumption of greenfield. The sand model gave similar result pattern like original case study soil behaviour. Clay model, in opposite, showed heaving at the beginning of construction that caused by the pressure induced by the weight of concrete and moving the water pressure toward the ground. One could conclude that, the elastic settlement profile occurred due to selected parameters of soil and Mohr Coulomb model.
引用
收藏
页数:6
相关论文
共 50 条
  • [21] Ground surface settlement analysis of shield tunneling under spatial variability of multiple geotechnical parameters
    Hu, Baolin
    Wang, Changhong
    HELIYON, 2019, 5 (09)
  • [22] Effects of important factors on surface settlement prediction for metro tunnel excavated by EPB
    Chakeri, Hamid
    Ozcelik, Yilmaz
    Unver, Bahtiyar
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2013, 36 : 14 - 23
  • [23] Prediction of surface settlement process based on model shield tunnel driving test
    Fang, Yong
    Yang, Zhihao
    Cui, Ge
    He, Chuan
    ARABIAN JOURNAL OF GEOSCIENCES, 2015, 8 (10) : 7787 - 7796
  • [24] Prediction of surface settlement process based on model shield tunnel driving test
    Yong Fang
    Zhihao Yang
    Ge Cui
    Chuan He
    Arabian Journal of Geosciences, 2015, 8 : 7787 - 7796
  • [25] Influence of Soil Parameters on Detecting Voids behind a Tunnel Lining Using an Impact Echo Method
    Ma, Meng
    Cao, Rongning
    Niu, Chao
    Zhang, Hougui
    Liu, Weining
    APPLIED SCIENCES-BASEL, 2019, 9 (24):
  • [26] Using Field Data to Improve the Settlement Prediction Model of a Breakwater on Soft Soil
    Verhaeghe, Hadewych
    De Vos, Leen
    Boone, Evy
    Goemaere, Jan
    JOURNAL OF WATERWAY PORT COASTAL AND OCEAN ENGINEERING, 2014, 140 (02) : 173 - 187
  • [27] Prediction of Soil Settlement caused by Double-Line Parallel Shield Tunnel Construction
    Wei Gang
    DISASTER ADVANCES, 2013, 6 (06): : 23 - 27
  • [28] Scalar- and vector-valued seismic fragility assessment of segmental shield tunnel lining in liquefiable soil deposits
    Shen, Yiyao
    El Naggar, M. Hesham
    Zhang, Dong-Mei
    Huang, Zhong-Kai
    Du, Xiuli
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2025, 155
  • [29] Study on longitudinal crack of shield tunnel segment joint due to asymmetric settlement in soft soil
    Zheng, Yong-Lai
    Han, Wen-Xing
    Tong, Qi-Hua
    Yang, Liu-Feng
    Pan, Jie
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2005, 24 (24): : 4552 - 4558
  • [30] Segmental joint model tests of immersed tunnel on a settlement platform: A case study of the Hongkong-Zhuhai-Macao Bridge
    Hu, Zhi-nan
    Xie, Yong-li
    Xu, Guo-ping
    Bin, Sheng-lin
    Zhang, Hong-guang
    Lai, Hong-peng
    Liu, Hong-zhou
    Yan, Chang-gen
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2018, 78 : 188 - 200