Sustainable Comprehensive Evaluation of highway Construction Project Based on ANP-FCE Model

被引:1
|
作者
Hu, Zhihua [1 ]
Zhang, Lei [2 ]
机构
[1] North China Univ Water Resources & Elect Power, Zhengzhou 450011, Peoples R China
[2] Henan Transport Investment Grp, Zhengzhou 450016, Peoples R China
关键词
highway construction project; sustainable evaluation; Analytic Network Process (ANP); Fuzzy Comprehensive Evaluation (FCE);
D O I
10.4028/www.scientific.net/AMR.639-640.1269
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Using Analytic Network Process (ANP) to determine the index weight of sustainable comprehensive evaluation of highway construction project and Fuzzy Comprehensive Evaluation (FCE) to evaluate synthetically, the ANP-FCE model is discussed. The method of sustainable comprehensive evaluation of highway construction project based on the ANP-FCE model is proposed, and the applicability in sustainable comprehensive evaluation of highway construction project is verified.
引用
收藏
页码:1269 / +
页数:2
相关论文
共 50 条
  • [41] Online evaluation method of coal mine comprehensive level based on FCE
    Shen, Ling
    Jing, Guoxun
    Zeng, Qiang
    PLOS ONE, 2021, 16 (08):
  • [42] Evaluation of Land Saving Effect for Highway Construction based on Composite Index Model
    Li, Xia
    Ren, Xilong
    SUSTAINABLE CITIES DEVELOPMENT AND ENVIRONMENT PROTECTION, PTS 1-3, 2013, 361-363 : 1671 - +
  • [43] The Construction Project Bid Evaluation Based on Gray Relational Model
    Yan Hong-yan
    CEIS 2011, 2011, 15
  • [44] Risk Management in Highway Construction Project Based on Integrated Project Management System
    Jing Bingyin
    Jing Chunju
    ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 1, 2008, : 146 - +
  • [45] Research on Performance Evaluation of Construction project based Analytic Hierarchy Process and Fuzzy Comprehensive Evaluation
    Liu, Jinming
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND INNOVATIVE EDUCATION (MSIE 2015), 2015, 32 : 195 - 203
  • [46] Evaluation Model of Project Management Maturity for Highway Enterprise
    Liu, Chi
    Zhang, Zhenji
    2018 5TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ECONOMICS SYSTEM AND INDUSTRIAL SECURITY ENGINEERING (IEIS 2018), 2018,
  • [47] Research on project post-evaluation of wind power based on improved ANP and fuzzy comprehensive evaluation model of trapezoid subordinate function improved by interval number
    Wang, Meng
    Niu, Dongxiao
    RENEWABLE ENERGY, 2019, 132 : 255 - 265
  • [48] Comprehensive Assessment of Highway Construction Based on Extension Engineering Method
    Chen, Tao
    Sun, Jie
    INTERNATIONAL CONFERENCE ON MECHANICAL, ELECTRONIC AND INFORMATION TECHNOLOGY (ICMEIT 2018), 2018, : 592 - 596
  • [49] Critical success factors of sustainable project management in construction: A fuzzy DEMATEL-ANP approach
    Mavi, Reza Kiani
    Standing, Craig
    JOURNAL OF CLEANER PRODUCTION, 2018, 194 : 751 - 765
  • [50] Study on main contents of highway construction project post-evaluation
    Wang, J.J.
    Xi'an Gonglu Jiaotong Daxue Xuebao/Journal of Xi'an Highway University, 2001, 21 (03):