Optimal job-shop scheduling with random operations and cost objectives

被引:29
|
作者
Golenko-Ginzburg, D [1 ]
Gonik, A [1 ]
机构
[1] Ben Gurion Univ Negev, Dept Ind Engn & Management, Fac Engn Sci, IL-84105 Beer Sheva, Israel
关键词
job-shop problem; pairwise comparison; coordinate descent search algorithm; random operation; total penalty and storage expenses;
D O I
10.1016/S0925-5273(01)00140-2
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We consider a job-shop manufacturing cell of n jobs (orders), J(i), 1 less than or equal to i less than or equal to n, and m machines M-k, 1 less than or equal to k less than or equal to m. Each job-operation O-il (the lth operation of job i) has a random time duration t(il) with the average value (t) over bar (il) and the variance V-il. Each job J(i) has its due date D-i and the penalty cost C-i* for not delivering the job on time (to be paid once to the customer). An additional penalty C-i** has to be paid for each time unit of delay, i.e., when waiting for the job's delivery after the due date. If job Ji is accomplished before Di it has to be stored until the due date with the expenses C-i*** per time unit. The problem is to determine optimal earliest start times S-i of jobs J(i), 1 less than or equal to i less than or equal to n, in order to minimize the average value of total penalty and storage expenses. Three basic principles are incorporated in the model: 1. At each time moment when several jobs are ready to be served on one and the same machine, a competition among them is introduced. It is based on the newly developed heuristic decision-making rule with cost objectives. 2. A simulation model of manufacturing the job-shop and comprising decision-making for each competitive situation, is developed. 3. Optimization is carried out by applying to the simulation model the coordinate descent search method. The variables to be optimized are the earliest start times Si. A numerical example of a simulation run is presented to clarify the decision-making rule, The optimization model is verified via extensive simulation. (C) 2002 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:147 / 157
页数:11
相关论文
共 50 条
  • [41] Dynamic job-shop scheduling algorithm of the non-close-joining operations
    College of Computer Science and Technology, Harbin University of Science and Technology, Harbin 150080, China
    Jixie Gongcheng Xuebao, 2008, 1 (155-160):
  • [42] Neural network for job-shop FMS scheduling with multiple objectives and various process plans
    Zhu, Lanjuan
    Wu, Zhiming
    Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2000, 34 (05): : 661 - 664
  • [43] A general efficient neighborhood structure framework for the job-shop and flexible job-shop scheduling problems
    Tamssaouet, Karim
    Dauzere-Peres, Stephane
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 311 (02) : 455 - 471
  • [44] CHARACTERISTICS OF JOB-SHOP OPERATIONS IN FIXTURE DESIGN
    HARGROVE, SK
    INDUSTRIAL ENGINEERING, 1994, 26 (12): : 26 - 26
  • [45] A Mathematical Model and Solution for Cost-Driven Job-Shop Scheduling Problem
    Sun, Kai
    Yang, Gen-ke
    Bai, Jie
    COMPUTER SCIENCE FOR ENVIRONMENTAL ENGINEERING AND ECOINFORMATICS, PT 2, 2011, 159 : 418 - +
  • [46] A BROADER VIEW OF THE JOB-SHOP SCHEDULING PROBLEM
    WEIN, LM
    CHEVALIER, PB
    MANAGEMENT SCIENCE, 1992, 38 (07) : 1018 - 1033
  • [47] Practical JOB-SHOP production scheduling algorithm
    Li, Hao-Lin
    Shanghai Ligong Daxue Xuebao/Journal of University of Shanghai for Science and Technology, 2002, 24 (04):
  • [48] Resource constraints for preemptive job-shop scheduling
    Pape C.L.E.
    Baptiste P.
    Constraints, 1998, 3 (4) : 263 - 287
  • [49] A genetic algorithm for flexible job-shop scheduling
    Chen, HX
    Ihlow, J
    Lehmann, C
    ICRA '99: IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, VOLS 1-4, PROCEEDINGS, 1999, : 1120 - 1125
  • [50] Job-shop production scheduling with reverse flows
    Abdeljaouad, Med Amine
    Omrane, Anissa
    Bahroun, Zied
    Fondrevelle, Julien
    2013 INTERNATIONAL CONFERENCE ON CONTROL, DECISION AND INFORMATION TECHNOLOGIES (CODIT), 2013, : 829 - 834