Medium-term forecasting of power generation by hydropower plants in isolated power systems under climate change

被引:6
|
作者
Safaraliev, Murodbek [1 ]
Kiryanova, Natalya [2 ]
Matrenin, Pavel [3 ]
Dmitriev, Stepan [1 ]
Kokin, Sergey [1 ]
Kamalov, Firuz [4 ]
机构
[1] Ural Fed Univ, Dept Automated Elect Syst, Ekaterinburg, Russia
[2] Novosibirsk State Tech Univ, Dept Automated Elect Power Syst, Novosibirsk, Russia
[3] Novosibirsk State Tech Univ, Dept Ind Power Supply Syst, Novosibirsk, Russia
[4] Canadian Univ Dubai, Dept Elect Engn, Dubai, U Arab Emirates
关键词
Medium -term forecasting of power generation; Hydropower plant; Isolated power system; GBAO; Ensemble models; Climate change; Temperature;
D O I
10.1016/j.egyr.2022.09.164
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Reliable operation of power systems (PS), including those with a significant share of hydropower plants (HPPs) in the energy balance, largely depends on the accuracy of forecasting power generation. The importance of power generation forecasts increases with the development of renewable power generation, which is stochastic by nature. Those kinds of tasks are complicated by the lack of reliable information on metrological data and estimated energy consumption, which is also stochastic. In the medium-term forecasting (MTF) of power generation by HPPs, the seasonality of changes in flow and inflow of water should be taken into account, which significantly affects the reserves and regulatory capabilities of the power system as a whole. This work discusses the problem of constructing a model for MTF of power generation HPP in isolated power systems (IPS), taking into account such atmospheric parameters as air temperature, wind speed and humidity. To address constant climatic changes, this paper suggests implementing machine learning models. The proposed approach is characterized by a high degree of autonomy and learning automation. The paper provides a comparative study of the machine learning models such as polynomial model with Tikhonov's regularization (LR), k-nearest neighbors (kNN), multilayer perceptron (MLP), ensembles of decision trees, adaptive boosting of linear models (ABLR), etc. Computational experiments have shown that the machine learning approach yields the results of sufficient quality, which allows to use them for forecasting of power generation HPP in isolated power systems under conditions of climate change. The Adaptive Boosting Linear Regression model is the simplest and most reliable machine learning model that has proven itself well in the tasks with a relatively small amount of training samples.(c) 2022 The Author(s). Published by Elsevier Ltd. This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).
引用
收藏
页码:765 / 774
页数:10
相关论文
共 50 条
  • [41] Specifics of hydropower plant management in isolated power systems
    Sultonov, Sherkhon
    Safaraliev, Murodbek
    Kokin, Sergey
    Dmitriev, Stepan
    Zicmane, Inga
    Dzhuraev, Shokhin
    PRZEGLAD ELEKTROTECHNICZNY, 2022, 98 (04): : 53 - 57
  • [42] A New Methodology to Obtain a Feasible Thermal Operation in Power Systems in a Medium-Term Horizon
    Montero, Luis
    Bello, Antonio
    Reneses, Javier
    ENERGIES, 2020, 13 (12)
  • [43] Power Generation Efficiency Evaluation of Hydropower Plants Based on the DEA
    Geng, Zhiqiang
    Jing, Shaoxing
    Han, Yongming
    Lin, Xiaoyong
    PROCEEDINGS OF THE 32ND 2020 CHINESE CONTROL AND DECISION CONFERENCE (CCDC 2020), 2020, : 290 - 295
  • [44] Impact of climate change on kaunas hydropower plant power production
    Punys, Petras
    Tirunas, Dainius
    Bagdziunaite-Litvinaitiene, Lina
    Pelikan, Bernhard
    7TH INTERNATIONAL CONFERENCE ENVIRONMENTAL ENGINEERING, VOLS 1-3, 2008, : 674 - 679
  • [45] The impact of uncertainties on the UK's medium-term climate change targets
    Watson, Jim
    Gross, Rob
    Ketsopoulou, Ioanna
    Winskel, Mark
    ENERGY POLICY, 2015, 87 : 685 - 695
  • [46] Medium-term peak shaving operation of cascade hydropower plants considering water delay time
    Liao, Shengli
    Liu, Huan
    Liu, Zhanwei
    Liu, Benxi
    Li, Gang
    Li, Shushan
    RENEWABLE ENERGY, 2021, 179 : 406 - 417
  • [47] Medium-term interval optimal scheduling of terraced hydropower plants considering carbon trading scenarios
    Zhou, Suyang
    Mou, Runfan
    Gu, Wei
    Wu, Zhi
    Guan, Aobo
    Pei, Rui
    ELECTRIC POWER SYSTEMS RESEARCH, 2024, 234
  • [48] Modeling of automatic generation control for power system transient, medium-term and long-term stabilities simulations
    Song, X. (songxl@epri.sgcc.com.cn), 1600, Power System Technology Press (37):
  • [49] Modeling and Optimization of the Medium-Term Units Commitment of Thermal Power
    Liao, Shengli
    Li, Zhifu
    Li, Gang
    Wang, Jiayang
    Wu, Xinyu
    ENERGIES, 2015, 8 (11): : 12848 - 12864
  • [50] Operational Analysis and Medium-Term Forecasting of the Greenhouse Gas Generation Intensity in the Cryolithozone
    Timofeev, Andrey V.
    Piirainen, Viktor Y.
    Bazhin, Vladimir Y.
    Titov, Aleksander B.
    ATMOSPHERE, 2021, 12 (11)