Power System Reliability Assessment with Full Topology Model

被引:0
|
作者
Dong, Feng [1 ]
Fan, Lei [1 ]
机构
[1] GE Energy Consulting, 1 River Rd, Schenectady, NY 12302 USA
关键词
Contingency analysis; failure frequency; average outage duration; probabilistic reliability assessment; full topology model;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This paper presents a comprehensive methodology of reliability assessment on power systems. The method uses full topology model with detailed substation configurations. With the full topology model, the auto breakers and manual switches are operated to simulate accurately the response of power systems to faults and the impacts of substation configurations on system reliability can be evaluated. The real system studies are carried out with the proposed method to quantify network probabilistic reliability measures with respect to various system problems including branch overloads, loss of loads, voltage violations or voltage collapse as identified in deterministic contingency analysis for EHV electric grid planning. These probabilistic indices provide a measure on system reliability from both the system and customer standpoints and complement the deterministic contingency results.
引用
收藏
页数:5
相关论文
共 50 条
  • [31] Quantum-Inspired Power System Reliability Assessment
    Nikmehr, Nima
    Zhang, Peng
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2023, 38 (04) : 3476 - 3490
  • [32] BULK POWER-SYSTEM RELIABILITY PERFORMANCE ASSESSMENT
    FONG, CC
    GRIGG, CH
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 1994, 46 (01) : 25 - 31
  • [33] Impact of WAMS Malfunction on Power System Reliability Assessment
    Aminifar, Farrokh
    Fotuhi-Firuzabad, Mahmud
    Shahidehpour, Mohammad
    Safdarian, Amir
    IEEE TRANSACTIONS ON SMART GRID, 2012, 3 (03) : 1302 - 1309
  • [34] System reliability assessment method for wind power integration
    Vallee, Francois
    Lobry, Jacques
    Deblecker, Olivier
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2008, 23 (03) : 1288 - 1297
  • [35] A New Reliability Assessment Model for Power Electronic Modules
    Zhuang, Xing
    Yadav, Om Prakash
    2015 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2015, : 1012 - 1016
  • [36] An improved method for power system generation reliability assessment
    Rejc, Ziva Bricman
    Cepin, Marko
    ELEKTROTEHNISKI VESTNIK-ELECTROCHEMICAL REVIEW, 2013, 80 (1-2): : 57 - 63
  • [37] Transmission reliability margin assessment of the Malaysian power system
    Othman, MM
    Mohamed, A
    Hussain, A
    NATIONAL POWER ENGINEERING CONFERENCE PECON 2003, PROCEEDINGS, 2003, : 343 - 346
  • [38] A Comprehensive Review on the Modern Power System Reliability Assessment
    Aruna, S. B.
    Suchitra, D.
    Rajarajeswari, R.
    Fernandez, S. George
    INTERNATIONAL JOURNAL OF RENEWABLE ENERGY RESEARCH, 2021, 11 (04): : 1734 - 1747
  • [39] Research on Reliability Assessment of Power System with Wind Farms
    Jiang, Wen
    Cheng, Yexia
    Cheng, Yejian
    PROGRESS IN RENEWABLE AND SUSTAINABLE ENERGY, PTS 1 AND 2, 2013, 608-609 : 588 - +
  • [40] Incorporating Unidentifiable Cyberattacks into Power System Reliability Assessment
    Ding, Zhilu
    Xiang, Yingmeng
    Wang, Lingfeng
    2018 IEEE POWER & ENERGY SOCIETY GENERAL MEETING (PESGM), 2018,